My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0041646
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARPENTER
>
2482
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0041646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 12:17:12 PM
Creation date
4/14/2021 10:23:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0041646
PE
4372
STREET_NUMBER
2482
Direction
E
STREET_NAME
CARPENTER
STREET_TYPE
RD
City
STOCKTON
Zip
95205-
APN
17914018
ENTERED_DATE
1/26/2021 12:00:00 AM
SITE_LOCATION
2482 E CARPENTER RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Baja Exploration; David Hogan dba: <br />Endorsement Number: 37 <br />Designated Construction Project(s) <br />General Aggregate Limit <br />This endorsement, effective 7/26/2020 attaches to and forms a part of Policy <br />Number FEI-ECC-16885-07. This endorsement changes the Policy. Please read <br />it carefully. <br />In consideration of an additional premium of $Applied, this endorsement modifies <br />insurance provided under the following: <br />COMMERCIAL GENERAL LIABILITY COVERAGE PART <br />SCHEDULE <br />Designated Construction Projects: <br />Those construction projects of the Named Insured when agreed to and <br />required under written contract. However, this coverage only applies for the <br />project specified in that contract. <br />(If no entry appears above, information required to complete this endorsement <br />will be shown in the Declarations as applicable to this endorsement.) <br />A. For all sums which the insured becomes legally obligated to pay as damages <br />caused by "occurrences" under COVERAGE A (SECTION I), and for all <br />medical expenses caused by accidents under COVERAGE C (SECTION I), <br />which can be attributed only to operations at a single designated "location" <br />shown in the Schedule above: <br />A separate Designated Construction Project General Aggregate Limit <br />applies to each designated construction project, and that limit is equal to <br />the amount of the General Aggregate Limit shown in the Declarations. <br />The Designated Construction Project General Aggregate Limit is the <br />most we will pay for the sum of all damages under COVERAGE A, <br />except damages because of "bodily injury" or "property damage" <br />included in the "products-completed operations hazard", and for medical <br />expenses under COVERAGE C regardless of the number of: <br />Insureds; <br />Claims made or "suits" brought; or <br />Persons or organizations making claims or bringing "suits". <br />CG 25 03 03 97 <br /> Copyright, Insurance Services Office, Inc 1996
The URL can be used to link to this page
Your browser does not support the video tag.