Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for AISLE 1 #2356 as of March 30 , 2021 . <br /> Open violations from July 29, 2020 inspection <br /> Violation #107 - Failure to submit and maintain complete and current financial responsibility documents . <br /> OBSERVATION Current financial responsibility documents were not found on site. <br /> REGULATION GUIDANCE: A copy of current financial responsibility documents are required to be maintained on <br /> site . <br /> CORRECTIVE ACTION: Immediately obtain a copy of the facility' s financial responsibility documents and maintain a <br /> copy on site . <br /> �SI This violation was corrected ❑ This violation will be corrected by ( date) : <br /> XSupporting documents included t� <br /> Describe actions taken or will betaken to correct violation : 1 `f� <br /> ellkrl Qi <br /> Violation #122 - Failure to implement corrections and submit written response within 30 days of receiving <br /> the report. <br /> OBSERVATION An inspection was last done on 07/09/2019 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 08/14/2019 This information has not been received resulting in a non-compliant status for this facility. <br /> REGULATION GUIDANCE: An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions . The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken . <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation :{ u4 WAM MEG ju <br /> Ar P <br /> Page 1 of 2 <br />