My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO1VCAOHA (3)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
205 (STATE ROUTE 205)
>
0
>
2500 – Emergency Response Program
>
CO1VCAOHA (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:20:36 PM
Creation date
4/14/2021 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2500 – Emergency Response Program
RECORD_ID
CO1VCAOHA
PE
2546
FACILITY_NAME
I-205
STREET_NUMBER
0
Direction
E
STREET_NAME
STATE ROUTE 205
City
TRACY
Zip
95304
APN
NEAR 21418017
ENTERED_DATE
8/14/2020 12:00:00 AM
SITE_LOCATION
EASTBOUND I-205 NEAR TRACY BLVD OFF RAMP
RECEIVED_DATE
8/13/2020 12:00:00 AM
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Complaint Investigation Summary <br /> Report #. 5105 <br />COMPLAINT ID: CO1VCAOHA Site Location: EASTBOUND 1-205 NEAR TRACY BLVD OFF RAMP <br />Received by: EE0009835 GAITAN <br /> Received Date: 8/13/2020 Complaint Received Via: PHONE <br />Assigned To: EE0009835 GAITAN <br /> Assigned Date: 8/13/2020 <br />Proaram/Element Code 2546 - Release/Spill Response (excluding Joint Team) <br />Nature of complaint: <br />DAMAGED SADDLE TANK ON SEMI-TRUCK CAUSED RELEASE OF 50 GALLONS OF DIESEL ON TO INTERSTATE 205 AND IMPACTED NEARBY <br />SOIL. <br />PROPERTY INFORMATION <br />Property Name: <br />Site Location 0 E 1-205 <br /> District 005 - ELLIOTT, BOB <br />TRACY, CA 95304 <br /> Location Code 03 - TRACY <br />Cross Street APN NEAR 21418017 <br /> <br />Complaint Status: Oi <br /> <br />Date Abated: 1-26 2c2I Abated By: <br /> <br />Activity Summary <br />Activity Date Recorded by <br />08/13/2020 Received a pager notification from front desk. Stated that an approximately GAITAN <br />50-gallon diesel released from a damaged saddle tank from a semi-truck. Located <br />in eastbound 1-205 near exit 8 (Tracy Blvd.). Contacted complainant, Michelle <br />Cortes from custard insurance adjusters. <br />Stated that Patriot Environmental was already on site performing clean up. She <br />confirmed that Werner Enterprises was the responsible party. She gave me the <br />contact information from Christine Bax. <br />Contacted Juan Armendarez, District Hazmat Manager for Caltrans. Asked if he <br />had been notified regarding the spill. He stated that he had not. Forward the spill <br />report to Juan's email. He stated that he would send someone to meet me out at <br />the spill site. <br />Met with Esther Herschbach, Supervisor for Caltrans and Ash from Patriot <br />Environmental. Ash sent me photos of the spill area prior to clean-up beginning. <br />Observed the following: <br />-Spill area stretched along the side of the interstate approximately 75 feet and <br />accumulating in the soil creating an additional spill area approximately 6 by 5 feet. <br />Ash stated that he would be placing absorbent on asphalt impacted with diesel <br />and would be shoveling the dies' impacted soil. Five 55-gallon containers with soil <br />contaminated with diesel were generated by the time I arrived. Ash stated that he <br />expects two more 55-gallon containers to be used. Contacted Muniappa Naidu <br />'Program Coordinator' notified him about the complaint. Received call from Garrett <br />Backus 'Lead Senior RENS' and discussed complaint. <br />Jesus Zuniga, Hazmat coordinator for Caltrans arrived. He stated that a portion of <br />1-205 would have to be re-paved. He stated that Caltrans and Patriot <br />Environmental will have to be schedule a date for re-pavement; he expected <br />re-pavement to occur next week. <br />Received call from Juan, stated that there was another spill off highway-99. <br />Contacted Garrett and discussed other spill. Based on discussion it was <br />determined that I would leave this site and attend the other spill site in Stockton. <br />Requested if Jesus and Ash can send me photos of manifest for waste removal <br />and clean up photos. They both stated that they would. <br />08/14/2020 Haza Saeed 'Lead Senior RENS' notified me that state water board wanted to <br />discuss the complaint. <br />Contacted Isabella Bencomo, from the state water board. Discussed complaint, <br />stated that clean-up is not complete and that a portion of 1205 is expected to be <br />repaved next week. <br />GAITAN <br />5105.rpt Page 1 of 3
The URL can be used to link to this page
Your browser does not support the video tag.