LLNL Emergency Management Plan(EPlan) <br /> Rev 26 <br /> January 2021 <br /> define what portion of the site is considered the incident scene that the IC will retain <br /> responsibility for protecting, and the balance of the site the ED will be responsible for protecting. <br /> Any protective action decisions for onsite personnel determined by the EOC should be <br /> coordinated with the IC. Protective actions for the public may be ordered only by public officials <br /> or their designees (e.g., ACFD, LPD); the EMDO/ED will make protective action <br /> recommendations only, which will be communicated to offsite officials both on Emergency <br /> Notification forms and via telephone conversations with the IC and local/state officials. <br /> 8.6 Termination of Protective Actions <br /> During an Operational Emergency, onsite protective actions will be modified or lifted at the <br /> direction of the ED following recommendation by the IC. This information will be <br /> communicated to appropriate onsite emergency response and facility personnel through <br /> established emergency communication systems. Changes to recommendations for affected offsite <br /> agencies will be communicated per EPO plans/procedures following any necessary coordination <br /> with local decision-makers. <br /> 8.7 Emergency Shutdown of Operations <br /> Emergency shutdown of operations in facilities should be performed, where practicable and it is <br /> safe to do so. If this is not feasible, shutdown will be performed by knowledgeable emergency <br /> response personnel. <br /> Site response guides and facility procedures (e.g., Safety Plans—including Facility Safety Plans <br /> and Integration Work Sheets) address shutdown for normal operations and emergencies. These <br /> procedures, which are developed and maintained by facility personnel and reviewed by the <br /> cognizant ES&H Team, are available to assist the operators in placing the building in a safe <br /> condition. <br /> 87 <br />