My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
1900 - Hazardous Materials Program
>
PR0519994
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 3:48:12 PM
Creation date
4/15/2021 12:02:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0519994
PE
1921
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LLNL Emergency Management Plan(EPlan) <br /> Rev 26 <br /> January 2021 <br /> define what portion of the site is considered the incident scene that the IC will retain <br /> responsibility for protecting, and the balance of the site the ED will be responsible for protecting. <br /> Any protective action decisions for onsite personnel determined by the EOC should be <br /> coordinated with the IC. Protective actions for the public may be ordered only by public officials <br /> or their designees (e.g., ACFD, LPD); the EMDO/ED will make protective action <br /> recommendations only, which will be communicated to offsite officials both on Emergency <br /> Notification forms and via telephone conversations with the IC and local/state officials. <br /> 8.6 Termination of Protective Actions <br /> During an Operational Emergency, onsite protective actions will be modified or lifted at the <br /> direction of the ED following recommendation by the IC. This information will be <br /> communicated to appropriate onsite emergency response and facility personnel through <br /> established emergency communication systems. Changes to recommendations for affected offsite <br /> agencies will be communicated per EPO plans/procedures following any necessary coordination <br /> with local decision-makers. <br /> 8.7 Emergency Shutdown of Operations <br /> Emergency shutdown of operations in facilities should be performed, where practicable and it is <br /> safe to do so. If this is not feasible, shutdown will be performed by knowledgeable emergency <br /> response personnel. <br /> Site response guides and facility procedures (e.g., Safety Plans—including Facility Safety Plans <br /> and Integration Work Sheets) address shutdown for normal operations and emergencies. These <br /> procedures, which are developed and maintained by facility personnel and reviewed by the <br /> cognizant ES&H Team, are available to assist the operators in placing the building in a safe <br /> condition. <br /> 87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.