Laserfiche WebLink
FV 0 Page 1 of 1 <br />Natalia Subbotnikova [EH] <br />From: <br />Joyesh Chandra [Jchandra@sjgov.org] <br />Sent: <br />Thursday, December 06, 2007 9:28 AM <br />To: <br />Natalia Subbotnikova [EH] <br />Cc: <br />Michael Carroll; Robert McClellon [EH]; MWochnick@ciwmb.ca.gov <br />Subject: CHSL-Revised Work Plan -Inst of 2 New GW Wells <br />Attachments: Revised GW Inst Work Plan-11-29-07.pdf <br />Natalia <br />Attached is the revised work plan for the installation of two new groundwater wells at our Corral Hollow Sanitary <br />Landfill. A revised map showing the approximate location of the temporary exploratory borings and the <br />groundwater wells is also included with the plan. The revised work plan is drafted based on initial scope of work <br />planned for the applied permits specifically. A final well installation report will be submitted to all regulatory <br />agencies. <br />As discussed, upon the submission of the revised work plan, all well permits initially applied for the groundwater <br />wells and the temporary borings will be approved. <br />If you need any additional information, please don't hesitate to call me at the phone number below. <br />Thanks <br />Joyesh J Chandra <br />San Joaquin County <br />Department Of Public Works <br />Solid Waste Division <br />PH -(209) 468-3066 <br />FAX -(209)468-3078 <br />jchandra@s-jgov.org <br />12/6/2007 <br />