My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (7/08 TO 12/08)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (7/08 TO 12/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:39:24 PM
Creation date
4/20/2021 1:14:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (7/08 TO 12/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ll <br />COST ESTIMATE <br />E <br />The cost of the corrective action plan and the EMP includes engineering design, field <br />investigations, construction and associated materials, permitting, and final reports. <br />Permitting associated with the project will include RWQCB and SJC well drilling <br />permits. The total project cost was estimated at approximately $290,000 (Table 1). <br />Table 1 Corrective Action Cost Estimate. <br />Permits/Inspections <br />RW QCB <br />LS $4,000 <br />Extended <br />Item <br />Quantity <br />Unit <br />Price <br />Cost <br />LFG System Enhancement <br />Vertical LFG Well <br />210 <br />LF <br />$130.00 <br />$27,300 <br />Lateral pipe on surface <br />350 <br />LF <br />$8.00 <br />$2,800 <br />Well head and connection <br />7 <br />each <br />$1,000.00 <br />$7,000 <br />LFG Extraction System Subtotal <br />$37,100 <br />Permits/Inspections <br />RW QCB <br />LS $4,000 <br />Well Drilling Permit Fee <br />LS $550 <br />Inspections <br />LS $500 <br />Permits/Inspections Subtotal <br />$5,050 <br />EMP Work Plan and Implementation <br />Professional and Technical. Services LS $64,000 <br />Driller Lab Surveyor Utility Clearance LS $130,000 <br />EMP Work Plan and Implementation Subtotal $194,000 <br />Engineering Design <br />Professional and Technical Services LS $50,000 <br />Final Report LS $5,000 <br />Engineering Design Subtotal $15,000 <br />Total Project Cost $291,150 <br />LA 21125 <br />N:\Miscellaneous\ClosCos tEst\FinAssur&Costs\CH Correct Action RFR 5-25-07.doc <br />Corrective Action Financial Assurance Cost Estimate 5 May 25, 2007 <br />Corral Hollow Sanitary Landfill San Joaquin County Public Works <br />
The URL can be used to link to this page
Your browser does not support the video tag.