Laserfiche WebLink
Drilling Company: <br />Date: <br />Wind Spd +Direction: <br />Weather Conditions: <br />Construction Company: <br />Drilling Equipment: <br />Diameter of <br />Construction Crew <br />Operator: <br />Boring (in.) <br />Crew Members: <br />Date: <br />Date: <br />Start Time: <br />Total Hours: <br />Start Time: <br />Stop Time: <br />Rate (ft/hr): <br />Stop Time: <br />Total (Min.): <br />Total (Min.): <br />0 <br />0 <br />m <br />° a <br />WELL CONSTRUCTION <br />A p U t <br />o <br />a a a <br />NOTES <br />Ft. <br />Depth to Top of Upper Seal <br />Ft. <br />GDepth to Btm of Upper Seal <br />Ft. <br />F-Depth to Top of Lower Seal <br />Ft. <br />E-Depth to Btm of Lower Seal <br />Ft. <br />t i <br />D-Depth to Bottom of Exp Ftg <br />l i <br />l i <br />l i <br />l l <br />Ft. <br />l l <br />l i <br />l � <br />l l <br />C-Length of Perforations <br />l � <br />l <br />Ft. <br />B-Depth to Bottom of Pipe <br />Ft. <br />A-Bore Depth <br />Station: <br />Northing: <br />R. f. <br />Description <br />Proposed Actual <br />Elevation: <br />A <br />Bore Depth <br />Easting: <br />B <br />Depth to Btm <br />Drilling Construction <br />C <br />Length ofPerfotations <br />Log Completed By: <br />D <br />Depth to Btm of Exp Ftg <br />E <br />Depth to Btm of Loeser Seal <br />F <br />Depth to Btm of Lower Seal <br />G <br />Depth to Btm of upper Seal <br />Drilling(Construction Log <br />LFG Well <br />WELL NO. <br />Construction Specs San Joaquin County <br />LFG Extraction Wells Public Works Department <br />Corral Hollow Sanitary <br />Date: <br />Wind Spd +Direction: <br />Weather Conditions: <br />Landfill 15 Solid Waste Division <br />Revised 9-25-08 <br />