My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (7/08 TO 12/08)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (7/08 TO 12/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:39:24 PM
Creation date
4/20/2021 1:14:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (7/08 TO 12/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />',, Page 1 of 3 <br />Natalia Subbotnikova [EH] <br />From: Joyesh Chandra [Jchandra@sjgov.org] <br />Sent: Wednesday, November 12, 2008 2:45 PM <br />To: Natalia Subbotnikova [EH] <br />Cc: Robert McClellon [EH]; Michael Carroll; Jaime Perez; Billy Baier; Ifgc97@aol.com <br />Subject: CHSL-LFG Ext Well Installation -Project Schedule <br />Hello Natalia <br />Thank you for faxing the approved well permit permits for the Landfill Gas (LFG) extraction well <br />installation project at our Corral Hollow Landfill. Per our phone conversation, Solid Waste <br />Division's contractor, LFG Control Inc, will begin the project on November 17; 200$. There are <br />minor changes in the order of work the Contractor will perform due to the availability of his drill <br />rig. The contractor has planned the following work schedule: <br />(Working Days: Monday to Friday lam to 5pm) <br />1. Nov 17: <br />Site preparation: Drill rig pads will be built near hard to access drilling locations. <br />2. Nov 18th -24th <br />a. Excavation of well Lateral trenches <br />b. Installation of well lateral pipes <br />c. Backfill of lateral trenches (Tentative) <br />d. Lateral/Header connection (Tentative) <br />3. Nov 24th <br />Drilling of the LFG wells will tentatively begin on November 24th. The drill rig crew may <br />take two to four hours to drill a well. Well construction will begin immediately after <br />drilling. <br />4. Nov 27th and Nov 28th <br />Thanksgiving holiday <br />5. Dec 9th <br />Construction completion <br />Inspection of all work will be coordinated with you per the project's work plan. The contractor <br />has been notified regarding EHD's inspection schedule (9 am to 3.30 pm, M -F). <br />Please let me know if you need any additional information. <br />Thanks <br />11/12/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.