Laserfiche WebLink
LFG Extraction Well Installation 2008 <br /> Corral Hollow Sanitary Landfill <br /> DRILLING LOG <br /> Well NO: EW- �a <br /> _ T <br /> Date: 12/2/08 <br /> Lo <br /> _Ued B - J Chandra Start Time: Total Drilling Hrs: <br /> Stop Time: <br /> Weather Conditions: Foggy, <br /> ---------------- ---- <br /> Well Details fi <br /> Boring Well Depth (From Existin rade) Drilling Rat (Ft/Hr) <br /> Diameter: 24" Proposed: 30 <br /> 4 <br /> Depth Drilled: <br /> Well Location : Northing Easting <br /> (Other Details <br /> Well Location Elevation: 02 1,4.re- L <br /> Drilling Company: Chase Pacific Drilling Equipement: Log Drill <br /> Method of Drilling: Auger Diameter: <br /> Operator:I Ken , Sahl <br /> Crew Members: LFG Control Crew <br /> —Depth Type of Relative Moisture Fill Dirt Estimated Other <br /> (FT) Material Decomposition Content % Refuse Notes <br /> From Grade. Encountered (0-1009/.) Disposal <br /> Time Frame <br /> 0 <br /> 5 19B r1 e -elLz eW <br /> 10 <br /> 15 <br /> 20 e <br /> 25 <br /> 30 <br /> 35 <br /> 40 <br /> 45 <br /> NA1 Corral HollowkLFG Collect System\LFG Ext Well Inst 08kwell Drilling Log SheetAs Revised 11/14/08 <br />