My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (7/08 TO 12/08)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (7/08 TO 12/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:39:24 PM
Creation date
4/20/2021 1:14:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (7/08 TO 12/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Quality Assurance A)Plan Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21,2008 <br /> ♦ Record of any site visitors. <br /> ♦ Signature of CQA Manager or CQA Monitor. <br /> ♦ Signature of the peer reviewer. <br /> 5.1.2 Observation and Test Data Sheets <br /> Observation and test data sheets will include the following information as is <br /> appropriate for the form being used: <br /> ♦ Date, Project name, and location. <br /> ♦ A unique number for cross-referencing and document control. <br /> ♦ Weather data, as applicable. <br /> ♦ A reduced scale site plan showing sample and test locations. <br /> ♦ Test equipment calibrations, if applicable. <br /> ♦ A summary of test results identified as passing, failing, or, in the event of <br /> a failed test, retest. <br /> ♦ Completed calculations. <br /> ♦ Signature of the CQA Manager or CQA Monitor. <br /> ♦ Signature of the peer reviewer. <br /> 5.1.3 Non-Conformance Reports <br /> In the event of a non-conformance event, a non-conformance verification report form <br /> will be included with the daily report. Procedures for implementing and resolving any <br /> non-conformities to the contract are outlined in Section 2.4 of this CQA Plan. <br /> 5.2 Weekly Progress Reports <br /> The CQA Manager will prepare weekly progress reports summarizing construction and <br /> quality assurance activities. The reports will contain, at a minimum, the following <br /> information: <br /> ♦ The date, project name, and location. <br /> ♦ A summary of work activities completed in the last week, and those <br /> expected to be performed in the next week. <br /> Vector Engineering, Inc. .143E Spring Hill Drive*Grass Valle CA• 530 272-2448 <br /> 9 9� P 9 Y� � ) <br /> -27- <br />
The URL can be used to link to this page
Your browser does not support the video tag.