Laserfiche WebLink
Construction Quality Assurance ) Plan 41 Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21,2008 <br /> ♦ A summary of all laboratory and field test results. <br /> ♦ Sampling and testing location drawings. <br /> ♦ A description of significant construction problems and the resolution of <br /> these problems. <br /> ♦ A list of changes from the construction drawings and specifications and <br /> the justifications for these changes. <br /> ♦ As-built record drawings. <br /> ♦ A statement of compliance with the construction contract documents and <br /> design intent signed and stamped by the CQA Officer. <br /> The as-built record drawings will accurately locate the constructed location of all work <br /> items, including the location of piping, anchor trenches, etc. All surveying and base <br /> maps required for the development of the record drawings will be prepared by the <br /> Contractor. The CQA Manager must review and observe that as-builts are correct. As- <br /> builts will be included in the FCR. <br /> Vector Engineering, Inc. .143E Spring Hill Drive*Grass Valley, CA• (530)272-2448 <br /> -29- <br />