Laserfiche WebLink
Drilling Company: <br />Construction Company: <br />Drilling Equipment: <br />Diameter of <br />Construction Crew. <br />Operator: <br />Boring (in.) <br />Crew Members: <br />Date: <br />Date: <br />Start Time: <br />Total Hours: <br />Start Time: <br />Stop Time: <br />Rate (f /hr): <br />Stop Time: <br />Total (Min.): <br />Total (Min.): <br />0 <br />0 <br />a E <br />E <br />° o <br />WELL CONSTRUCTION <br />A A <br />NOTES <br />Ft. <br />Depth to Top of Upper Seal <br />Ft. <br />G -Depth to Btm of Upper Seal <br />Ft. <br />F -Depth to Top of Lower Seal <br />Ft. <br />E -Depth to Btm of Lower Seal <br />Ft. <br />1 i <br />D -Depth to Bottom of Exp Ftg <br />t i <br />1 i <br />1 i <br />Ft. <br />1 i <br />1 i <br />1 i <br />C -Length of Perforations <br />1 i <br />1 i <br />1 i <br />Ft. <br />B -Depth to Bottom of Pipe <br />Ft. <br />A -Bore Depth <br />Station: <br />Northing: <br />Ref. <br />Description <br />Proposed Actual <br />Elevation: <br />A <br />Bore Depth <br />Easting: <br />B <br />Depth to atm <br />Drilling Construction <br />C <br />Length of Perforations <br />Log Completed By: <br />D <br />Depth to Btm of Exp Ftg <br />Date: <br />E <br />Depth to Btm of Low r Seal <br />V1And Spd +Direction: <br />F <br />Depth to Btm of Lower Seal <br />Weather Conditions: <br />G <br />Depth to Btm of Upper Seal <br />DrillinglCorvl, ion Log <br />LFG Well <br />WELL NO. <br />Construction Specs <br />LFG Extraction Wells <br />Corral Hollow Sanitary Landfill <br />Revised 9-25-08 <br />15 <br />San Joaquin County <br />Public Works Depart <br />ment <br />Solid Waste Division <br />