My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2025 12:48:29 PM
Creation date
4/20/2021 1:45:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0440005
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
201060013, 5
CURRENT_STATUS
Active, billable
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
9999 AUSTIN RD MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[A <br />California Integrated Waste Management Board <br />Disposal Facility Inspection Report (52) <br />39 -AA -0015 1 9/29/2009 1 LEA Periodic <br />Forward Landfill, Inc. I Forward, Inc./Allied Waste North America <br />S. Austin Road <br />Robert McClellon <br />I THE ABOVE FACILDV WAS INSPECTED FOR COMPLIANCE WITH APPLICABLE SECTIONS OF THE DIVISION 30 OF THE PUBLIC RESOURCES CODE (PRC) AND TITLE 14 AND TITLE 27 CALIFORNIA CODE OF REGULATIONS (CCR) I <br />Routine inspection was conducted this date and the following was noted: <br />1. The facility installed 2 permiter gas probes. One of the wells was installed between GP16 and GP17. The well was triple completion. The other <br />probes was installed between GP24 and GP25. That well was double completion. The site meets the minimum requirements of T27CCR, section <br />20925. <br />2. The facility needs to submit the winterization plan for the upcoming winter season. The plan needs to be submitted by Nov. 1, 2009. <br />3. The perimeter gas probes were sampled. The results are as follows: <br />GP 9 and GP12 0.0% CH4 (S)(1)(D) <br />GP11 (S) 0.0% CH4 (1) 0.0% CH4 (D) 0.2%CH4 <br />4. The down drains on the north slope of the old Austin Road site have debris in them. Remove. <br />
The URL can be used to link to this page
Your browser does not support the video tag.