My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2021 8:26:21 AM
Creation date
4/21/2021 9:51:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
21721070
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN10 A Q U I NEnvironmental Health Department <br /> COUNTY ---- RECEIVE ® <br /> UST SYSTEM RETROFIT OR REPAIR JUN . 2 3 2021 <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD ) <br /> 1 . Site map enclosed ? YES [x] NO [ ] ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> 2 . Submit copies of ICC Service Technician and /or Installer' s certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced . Ensure a copy of <br /> the " Site Health and Safety Plan " is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements . If repairing a component, describe <br /> how this will be done . ( If adding piping , LIDC ' s , or other UST equipment , or performing tank top upgrade , <br /> use the UST Installation Application pages 4- 8 as necessary for a timely plan review) : <br /> Lock Out/Tag Out the power to the monitoring system . <br /> Remove the existing Veeder- Root probe and OPD drop tube. <br /> Install 4" diesel float kit and re-install the in tank probe . <br /> Install OPD drop tube . <br /> Certify the probe and OPD drop tube . <br /> 4 . List of equipment to be used (Attach manufacturer' s specification sheets showing third -party approval) : <br /> OPW Dual Point Vapor-Tight 4" x 15' EVR . Emco Wheaton A1100-EVR-056 <br /> Mag Probe Install Kit Diesel 4" Float 5' Cable . Veeder-Root 849600-001 <br /> 5 , Decontamination Procedures : <br /> a . Will piping be decontaminated prior to removal ? YES [ ] NO [x] <br /> b . Identify contractor performing decontamination : <br /> Name NA Phone ( ) <br /> Address City Zip <br /> 3of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.