My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
324
>
2900 - Site Mitigation Program
>
PR0539852
>
WORK PLANS_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:20:02 AM
Creation date
4/21/2021 11:39:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
PRE 2019
RECORD_ID
PR0539852
PE
2953
FACILITY_ID
FA0022798
FACILITY_NAME
TRACY OFFICE PLAZA
STREET_NUMBER
324
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23518005
CURRENT_STATUS
02
SITE_LOCATION
324 E ELEVENTH ST
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tk2__ OFFICE PLAZA Page 1 of 2 <br /> Path to Closure Plan : GO GEOTRACKERHOMEIMANAGE PROJECTS IREPORSI5 R OL GOUT <br /> TRACY OFFICE PLAZA(T10000006059)-MAP THIS SITE OPEN-SITE ASSESSMENT <br /> 324 EAST ELEVENTH STREET CLEANUP OVERSIGHT AGENCIES <br /> TRACY,CA 95376 ACTIVITIES REPORT SAN JOAQUIN COUNTY LOP(LEAD)-CASE#:0002083 <br /> SAN JOAQU I N COUNTY PUBLIC WEBPAGE CASEWORKER:VICKI MCCARTNEY-SUPERVISOR:ADRIENNE ELLSAESSER <br /> VIEW PRINTABLE CASE SUMMARY FOR THIS SITE CENTRAL VALLEY RWQCB(REGION 5S)-CASE#:391192 <br /> CASEWORKER,JAMES BARTON-SUPERVISOR:CORI CONDON <br /> THIS PROJECT WAS LAST MODIFIED BYbVfj HENDERSONON 6262014 2:30:47 PM-HISTORY <br /> Path to Closure Plan THIS VERSION IS FINAL AS OF 6/262014 PATH TO CLOSURE HISTORY CLEAR/RESET PATH TO CLOSURE PLAN <br /> IMPEDIMENT 1: <br /> General Criteria E:A conceptual site model that assesses the nature,extent,and mobility of the release f procedural Impediment-INFO <br /> has NOT been developed <br /> Step,to Resolve Impediment 1-Ste 1:- <br /> COMPLETION DATE <br /> Implement approved s'`.a assessment a-.4: pi-. <br /> PROJECTED DATE ACTUAL DTE <br /> 9/30/2014 <br /> t0 Resolve Impediment 1-Step 2:-DELETE STEP -- <br /> COMPLETION DATE <br /> Prepare and submit a report of findings from the site assessment. <br /> PROJECTED DATE ACTU LDATE <br /> 12/31/2014 <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 2: <br /> General Criteria F:Secondary source has NOT been removed to the extent practicable F_ Procedural Impediment-INFO <br /> Step to Resolve Impediment 2-Ste 1:- S P <br /> COMPLETION DATE <br /> Assess secondary source. MIUAL 2A19 <br /> ROJECTED DA <br /> 9/30/2014 <br /> Step t0 Resolve Impediment 2-Step 2:- LETE STEP <br /> COMPLETION DATE <br /> Prepare and submit a report of findings from the site assessment, characterizing the secondary source - - <br /> and evaluating the necessity for remediation of the secondary source. PROJECTED DATE ACTUAL DATE <br /> 1 2/3 1120 1 4 �— <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 3: <br /> Media-Specific Criteria:Groundwater:The contaminant plume that exceeds water quality objectives is I— Procedural Impediment-INFO <br /> NOT stable or decreasing in areal extent,and does NOT meet all of the additional characteristics of one of <br /> the five classes of sites. <br /> Conditions that do not meet the policy criteria: <br /> • Plume Length(That Exceeds Water Quality Objectives):Unknown <br /> • Plume is Stable or Decreasing in AREAL Extent:Unknown <br /> • Free Product in Groundwater:Unknown <br /> • Benzene Concentration:Unknown <br /> • Nearest Supply Well(From Plume Boundary):Unknown <br /> St to Resolve Impediment 3-St 1:-DELETE STFP COMPLETION DATE <br /> Implement approved work plan for initial assessment of impact to groundwater. <br /> OJ CTED DA ACTUAL DATE <br /> �— <br /> Step to Resolve Impediment 3-Ste 2:-DELETE STEP - - <br /> COMPLETION DATE <br /> Submit report of findingd and recommendation regarding impact to groundwater. <br /> PROJECTED DATE ACTUAL DATE <br /> 12/31/2014 <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 4: <br /> Media Specific Criteria:Petroleum Vapor Intrusion to Indoor Air:The site is NOT considered low-threat for L r Procedural Impediment-INFO <br /> the vapor-intrusion-to-air pathway and site-specific conditions do NOT satisfy items 2a,2b,or 2c. -- <br /> Conditions that do not meet the policy criteria: <br /> • Free Product:Unknown <br /> • TPH in the Bioattenuation Zone:2100 mg/kg <br /> • Bioattenuation Zone Thickness:Unknown <br /> • 02 Data in Bioattenuation Zone:No 02 Data <br /> • Benzene in Groundwater:Unknown <br /> • Soil Gas Benzene:Unknown <br /> • Soil Gas EthylBenzene:Unknown <br /> • Soil Gas Naphthalene:Unknown <br /> Step to Resolve ImpedimeM 4-Step 1:-2LLLM STEP - <br /> COMPLETION DATE <br /> Implement currently (WP dated 11/22/13) ;-__coed site assessment work plan. --- <br /> PROJECTED DATE ACTUAL DATE <br /> 9/30/2014 I <br /> https:Hgeotracker.waterboards.ca.gov/regulators/screens/closure_policy.asp?global_id=T 1... 6/26/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.