Geosynte& <br /> consultants <br /> Well installation and development activities will be completed in accordance with SOP 1.0 <br /> provided in Appendix D. Proposed well construction details are shown on Table 12.The surface <br /> completion on each well will consist of a flush-mount,traffic-rated well box. Figures 11 B and <br /> 11 C show the typical injection wellhead fitting for horizontal and vertical injection wells, <br /> respectively. The horizontal well will have vaults on both ends of the well,to provide the ability <br /> to inject into and access both sides,as needed.The injection wellhead fitting will consist of a <br /> compression fitting,pressure gauge,vent valve,butterfly valve,and flowmeter connected to the <br /> injection manifold.After well installation,these wells will be given sequential well numbers. <br /> Once the monitoring wells and injection wells have been installed and developed,they will be <br /> incorporated into the existing Site MRP R5-2010-0803 and the forthcoming RWQCB-approved <br /> General WDR Permit MRP. <br /> 9.4.2 Shallow Target Area <br /> Implementation of an EISB"bio-barrier"is detailed in this section.Newman Zone®will be <br /> injected into the Shallow Target Area first via amendment delivery,then the Shallow Target <br /> Area will be bioaugmented with KB-I®Plus once reducing conditions are observed in <br /> groundwater. <br /> 9.4.2.1 Amendment Delivery <br /> For Shallow Target Area treatment,potable municipal water will be amended in-line with <br /> Newman Zone®using a dosing pump,and injected into the horizontal well via temporary, <br /> above-ground conveyance hosing. The source of the potable water will either be from the on- <br /> Site municipal connection or will be temporarily piped from a nearby hydrant along South <br /> Argonaut Street.The dosing pump setup is further described in the Deeper Target Area Section <br /> 9.4.3 below. This process flow is shown in Figure 11 B. <br /> As shown in Table 11,a total of approximately 31,200 gallons of Newman Zone®is targeted <br /> for delivery into the Shallow Target Area during Phase 2,dosed into the water at approximately <br /> 2%v/v(781,000 gallons of water). During the first day,the injection flow rate will be <br /> incrementally increased while injection pressures are monitored.The flow rate for the <br /> remainder of the injections will be selected to optimize amendment delivery.Assuming an <br /> average injection flow rate of 30 gpm based on experience at similar sites, it is estimated that <br /> the Shallow Target Area electron donor injections will continue for approximately 25 days. <br /> During amendment delivery,amendment delivery flow rates,pressures,and total volume will <br /> be monitored and recorded.Monitoring will also include the measurement of water levels in <br /> MW-E and MW-F to assess groundwater mounding. In addition,groundwater samples from <br /> MW-E and MW-F will be periodically collected to visually evaluate the arrival of EVO at that <br /> well,as groundwater will have a white,milky color when newly-injected EVO is present. <br /> RAW 51 02.06.2015 <br />