heads will be finished with locking stovepipe -type monuments embedded in concrete pads <br />and protected by concrete -filled traffic posts (bollards). A steel bolt will be embedded in <br />the concrete pad to serve as a reference point for the elevation survey. A representative <br />well construction diagram is presented on Figure 4. <br />3.4.3 Surveying <br />Surveying of completed monitoring wells will be conducted by the County. Top of casing <br />and ground surface elevations will be surveyed and tied to the existing ground water <br />monitoring datum to the nearest 0.01 foot. The location of the well will be surveyed and <br />identified in the groundwater monitoring network site map. <br />3.4.4 Monitoring Well Development <br />After placement of the sand pack and prior to placement of the bentonite chips, all wells <br />will be pre -developed using bailing or surging techniques to settle the sand pack and <br />remove fines. The level of the sand pack within the annulus will be measured both before <br />and after the predevelopment process, and additional sand will be added to the borehole, <br />as necessary, to bring the sand pack to the design elevation. <br />After the bentonite chip seal is constructed, the bentonite will be allowed to hydrate for at <br />least one hour before additional well development. At that time each well will be <br />developed using a bailer and surge block and, if necessary, by pumping and surging with a <br />well development pump or bailer until visually clear, non -turbid (approximately 5 NTU) <br />water is discharged from the well, and the temperature, pH, and specific conductivity of <br />discharge water stabilizes. The field geologist will record water quality parameters during <br />development using a calibrated Horiba U52 water quality meter (or similar). <br />Well <br />development and groundwater sampling records will be recorded on a Water Sample <br />p <br />Log Form, and/or on the sampler's daily field report. The information to be included on well <br />development and groundwater sampling records will include: <br />■ Name of sampler, <br />■ Total depth of well, casing diameter, and well volume, <br />■ Starting groundwater level, <br />■ Time log of groundwater removal, general clarity, temperature, pH, and electrical <br />conductivity, <br />■ Total well volumes removed, <br />■ Sample bailing rate, <br />■ Time of sample acquisition, <br />■ Final depth to water, and <br />■ Any problems encountered and their solutions. <br />11 <br />2011-0115 CHSL EMP Workplan Geo -Logic Associates <br />Revision 2 — January 11, 2012 <br />