Laserfiche WebLink
0 0 Page 1 of 1 <br /> Natalia Subbotnikova [EH] <br /> From: Joyesh Chandra[Jchandra@sjgov.org] <br /> Sent: Monday, January 30, 2012 9:08 AM <br /> To: Natalia Subbotnikova[EH] <br /> Cc: Michael Carroll <br /> Subject: Corral Hollow_EMP Phase 2—Schedule <br /> Hello Natalia <br /> We have tentatively scheduled the phase 2 investigation work of the Evaluation Monitoring <br /> Program (EMP) work near our Corral Hollow Landfill in reference to the EMP work plan Revision <br /> No 2. This work schedule is depended on the encroachment permit approval from Caltrans and <br /> weather conditions. <br /> We request EHD to make a note of the project's tentative schedule. As required by the drilling <br /> permit general guidelines, we will confirm the work schedule five working days before starting the <br /> project. The driller has been notified about EHD's inspection time from 9:00am to 3:30 pm. <br /> TENTATIVE PROJECT SCHEDULE <br /> 1. Drilling of three (3) borings and installation of temporary groundwater (GW) wells: February <br /> 21 st to 24th <br /> A. EHD will be notified for inspection of the temporary wells. <br /> 2. Groundwater sample lab analysis (Approximately 2 weeks) <br /> 3. Well completion or well abandonment (Based on the results of the GW samples): March <br /> 12th to 16th. <br /> A. EHD will be provided an estimated time for well completion or well abandonment <br /> inspection. <br /> B. EHD will be notified of other consecutive inspections after the first inspection in the <br /> field. <br /> Let me know if you need any additional information. <br /> Thanks <br /> ]OYESH CHANDRA <br /> SAN JOAQUIN COUNTY <br /> PUBLIC WORKS DEPARTMENT <br /> SOLID WASTE DIVISION <br /> 1810 E. HAZELTON AVE <br /> STOCKTON, CA 95201 <br /> PH: (209) 468-3066 <br /> FAX: (209) 468-3078 <br /> EmaihichandraCa siamorg <br /> 1/30/2012 <br />