My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
8020
>
2900 - Site Mitigation Program
>
PR0542234
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 9:36:04 AM
Creation date
4/26/2021 8:40:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0542234
PE
2960
FACILITY_ID
FA0024261
FACILITY_NAME
CALIFORNIA ARMY NATIONAL GUARD
STREET_NUMBER
8020
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206-3919
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
8020 S AIRPORT WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE MITIGATION PROGRAM CHECKLIST <br />SITE LOCATION: (o , C iikCi) i- 5 d-a-cAL-Te\-- / FM: <br />I <br />PR# e s 47.4;5 ti —Lot <br />DATE ACTIVITY INITIAL yi ot Review submittal and make sure all documents/fees have been submitted. <br />Request documents/fees not submitted. dk.ej tiFIL. jelk. ./ ciit,,,. ji V7 S ji,... <br />MFR to Accounting to ensure project has a FA# and 0'4 The P6i for <br />agency changes, a new PR# must be created under - v So <br />Provide <br />project does not change. If the lead <br />the existing FA. <br />el vf \ <br />Issue SR for Work Plan Review - Enter the data into the SR form in EC making sure <br />L <br />_ <br />to link the SR to the related FA. Generate an SR# and document on the permit form. If <br />no permit form has been submitted, record the information on a golden rod Service <br />Request form. Use this SR# on your DAR to track time spent obtaining documents/ <br />fees, reviewing work plan, issuing permits, coordinating field work activities, reviewing <br />subsequent report/sample results, making notifications/referrals. <br />lt-IA, Work Plan SR#: 0°11qc11 <br />1"-fs <br />Review Work Plan to ensure scope of work matches the scope of work approved by <br />construction/destruction meets SJC Ordinance Code L. ,)c the lead agency and that the mw <br />and well standards. <br />a <br />1(0 <br />Issue Permits - Enter permit information into WP form in EC, link to the FA# for the <br />WP# on DAR to track time spent in the field for the <br />on the permit. <br />v. <br />P project, and obtain a WP#. Use this <br />specific mw/boring activity specified <br />q WP#: 00 -1'.1 0 <br />Scope: 4 e- <br />)4,1 V c r ( itvne ) e.;d 1D2-, <br />WP#: Scope: <br />WP#: Scope: <br />WP#: Scope: <br />WP#: Scope: <br />After scope of work on the well and boring permit WPs are complete, update the <br />following fields in the Well Permit Approval Dates section of the WP form in EC: Plan <br />Status - choose `Finaled'; Final Inspection - enter date permit finaled. <br />After all field work is complete, flag calendar to follow up on report of findings. <br />Report Review: <br />Projects -Review report to determine if <br />present, print out a 5021 and request a <br />2960. Provide 5021 to Accounting Office for <br />65 Notification. Send notification letter to CVRWQCB. <br />-Review report to determine next phase of work to <br />appropriate. Complete Prop 65 for any new <br />-Review report to determine if any immediate public <br />health concerns are found, notify supervisor <br />further notifications. Complete Prop 65 for any new <br />Environmental Assessment <br />contamination was found. If contamination <br />new PR# be issued under PE <br />processing. Complete a Prop <br />END Lead Oversight Projects <br />be conducted or if closure is <br />contaminants found at the site. <br />Other Lead Agency Projects <br />health issues are found. If public <br />immediately for follow up and <br />contaminants found at the site. <br />After scope of work for the project SR is complete, update the following fields in the <br />Service Request Approval Dates section of the SR form in EC: Plan Status - choose <br />`Finaled'; Final Inspection - enter date work finalized. <br />EHD-29 8/15/17 <br />Site Mitigation Program Checklist
The URL can be used to link to this page
Your browser does not support the video tag.