My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 4:18:58 PM
Creation date
4/28/2021 8:35:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEIIRP1200_17� <br /> sump, where it can be easily observed or detected prevent water from entering the interstitial space <br /> by a sensor. of double-walled piping. Without these fittings, <br /> the integrity of the sump cannot be tested using <br /> This section describes a hydrostatic test method. this method. <br /> There are vacuum test methods available for con- <br /> tainment sumps. Consult the manufacturer before 5.If interstitial monitoring sensors are present <br /> performing a vacuum test. within the containment sumps, temporarily <br /> remove them before conducting the test. If the <br /> NOTE:Follow the manufacturer's instructions sensor is removed, reposition after testing to <br /> when testing the interstitial spaces of double- appropriate position according to the manufac- <br /> walled containment sumps. turer's instructions. <br /> 6.If the containment sump is found to have cracks, <br /> 6.5.2 Purpose. This section describes the prepa- loose parts or separation of any joints or penetra- <br /> ration and procedures to test the integrity of con- tion fittings, it is not considered to be liquid- <br /> tainment sumps to ensure that they do not leak. tight.This visually indicates a test failure. <br /> 6.5.3 Description of Test. The containment - <br /> sump is filled to the proper level with water. The CAUTION: Water can damage electrical <br /> water level is measured at the beginning and end of connections. Ensure that there are no <br /> the test. components that can be damaged by the <br /> addition of water to the sump. If such <br /> 6.5.4 Test Equipment. Test equipment shall components are present,take appropriate <br /> include: precautions when performing the test or <br /> • water; use an alternative test method. <br /> • measuring stick that is accurate to within 1/16 <br /> (0.063)inch and of sufficient length; <br /> • stopwatch or other time-measurement device <br /> capable of measuring a 1-second increment. <br /> 6.5.5 Preparation. waterElectdcat <br /> Level Junction <br /> 1.Care should be taken when conducting the test 1 Box <br /> in the rain or during freezing weather condi- <br /> Electrical <br /> tions. Conduit <br /> 2.Remove and properly dispose of any liquid and Product <br /> debris (leaves, sediment and trash) in the con- Piping <br /> tainment sump. <br /> 3.Inspect the containment sump for damage. - - - <br /> Examine all penetration fittings. conduits. iunc- FIGURE 6-5. The test fluid level in the under dispenser <br /> tion boxes,caps and risers (if present),and side- containment(UDC)must be at least 4 inches above the <br /> wall seams for defects, damage or improperly highest sump penetration or sidewall seam. <br /> installed components. If there are loose com- <br /> ponents (e.g., loose penetration fitting clamps <br /> or missing interstitial space caps), correct these 6.5.6 Test Procedure. <br /> items before performing the integrity test. If 1.Begin the test by adding water to the sump to a <br /> there are items that must be repaired or replaced minimum of 4 inches above the highest sump <br /> a (e.g., deteriorated penetration fitting boots), penetration or sump sidewall seam,whichever is <br /> notify the owner/operator and obtain approval higher. To compensate for sump deflection, the <br /> prior to proceeding with repairs. water must be allowed to settle a minimum of <br /> 4.Test boots or secondary containment termina- 15 minutes before taking the initial test measure- <br /> tion fittings must be present on the piping pen- ment. If the highest sump penetration or sump <br /> etrating the sump. During testing, these fittings sidewall seam is less than 4 inches from the top <br /> '.� pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.