Laserfiche WebLink
UST Program: Monitoring Plan for UST Tank ...: CERS Business 2 <br /> U,hD lo4('o n * ( 0� <br /> California Environmental Reporting System:Business lose Hernandruz's Acgoimt Sian Out Tools Reports HEID <br /> CERS Business Home submittals Facilities compTiance My 8usiness I <br /> UST Monitoring SUSO-CORPORAT-L-L YARD <br /> iD <br /> Instrudions/Help S <br /> UST Tank#TA0606338 <br /> A UST monitoring plan must be completed for each tank/UST System entered into CERS This form must be updated within 30 days of changes in the information it contains. <br /> Please note that your local agency may require you to obtain approval prior to installing or modifying monitoring equipment <br /> Select Edit to modify this monitoring plan <br /> UST monitoring plans must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed Provide this document using the UST <br /> Monitoring Site Plan supplemental documentation found elsewhere in the UST submittal element <br /> —Submittal Element History <br /> Submitted for CERS ID 10181673 on 5/27/2021 10:50AM by Jose Hernandez of SUSD-CORPORATE YARD[STOCKTON.CA] <br /> Coley Monitoring Plan Information <br /> This section would allow the user to copy Monitoring Plan information from another tank.This option would only appear if this facility had one or more existing <br /> This <br /> with Monitoring Plans <br /> Facility lnformation Equipment Testing and Preventive Malntenance---] rMonitoring Locations <br /> SUSD-CORPORATE YARD Monitoring Equipment Serviced Site Plot Plan Submitted <br /> 1932 EL PINAL DR + Annually Site Plan Previousty 8ubmilled <br /> STOCKTON , CA 95205 <br /> Tank Monitoring is Performed Using the Following Method(s) <br /> Yes Continuous Electronic Tank Monitoring'v <br /> Secondary Containment System Monitor PaW Manuraelunsr Leak Sensor Manufacturer <br /> Dry Incon Incon <br /> Monitor Panel Model Leak Sensor Model# <br /> TS550evo ELS <br /> No Automatic Tank Gauging`v, <br /> No Monthly Statistical Inventory Reconciliation u <br /> No Weekly Manual Tank Gauge'a No Tank IntegrityTesting'vo <br /> Nocher Monitoring w <br /> Pipe Monitoring is Performed Using the Following Method(s} <br /> Yes Continuous Monitoring of Piping Secondary Containment'u <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Dry INCON INCON <br /> Panel Model# Leak Sensor Model <br /> TS550evo ULS <br /> Leak Alarm Triggers Automatic Pump Shutdown <br /> Yes <br /> Failure/Disconnect Triggers Pump Shutdown <br /> Yes <br /> Yes Mechanical Line Leak Detector Performs 3 GPH Leak Test N <br /> MILLI)Manufacturer MLLD Model <br /> Red Jacket FXIV <br /> No Electronic Line Leak Detector Performs 3 GPH Leak Test it <br /> No Pipeline Integrity Testing u No Visual Pipeline Monitoring vo <br /> No Suction Piping Meets Exemption Criteria'v <br /> No No Regulated Piping Per Health and Safety Code,Division 20,Chapter 6.7 Is Connected To The Tank System 41 <br /> No Other Pipeline Monitoring'o <br /> f <br /> Under Dispenser Containment(UDC)Monitoring <br /> UDC Moriltorin <br /> Continuous <br /> https://cersbusiness.calepa.ca.gov/49877/Facility/101815 73/Submittal[UST/49123 95/Moni... 5/27/2021 <br />