My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 12:32:29 PM
Creation date
4/28/2021 8:36:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A Q U I N Environmental Health Department <br /> COUNTY <br /> RETURN TO COMPLIANCE CERTIFICATION <br /> Any MINOR violations noted in the"Notice to Comply"in the attached Inspection Report must be corrected within 30 days of <br /> receipt of this inspection. This certification form must be submitted to the Environmental Health Department(EHD)address at <br /> the bottom of this form within 30 days of receipt of the Inspection Report. HSC 25404.1.2(c)(1) <br /> All corrections to other violations noted in the attached Inspection Report(IR)or Continuation Form, or disputes to any <br /> violations, are to be submitted using this certification and returned to EHD within 30 days unless otherwise specified in the <br /> Inspection Report. HSC 25185(c)(3) <br /> Note: All EHD staff time associated with failing to comply by the above noted dates will be billed <br /> at the current hourly rate. <br /> For this certification to be complete, the operator of the site must include: <br /> A statement documenting what corrective actions were taken or will be taken for each violation <br /> Copies of sample results/manifests/training records/other appropriate paperwork,and/or photos verifying corrections <br /> Operator's certification <br /> Inspection Date: May 18, 2021 Inspected By: ELIANNA FLORIDO <br /> Facility Address: 1932 EL PINAL DR, STOCKTON CERS ID: 10181573 <br /> 1 certify under penalty of law that: <br /> 1. I have corrected the violations specified in the Inspection Report from the above-mentioned inspection date. <br /> 2. 1 have personally examined the following documentation submitted as proof of compliance FOR EACH VIOLATION <br /> and I believe the information to be true, accurate, and complete: <br /> Photos_ ** Paperwork *' Statement <br /> 3. 1 am authorized to submit this certification on behalf of the Respondent. <br /> 4. 1 am aware that there are significant penalties for submitting false information, including the possibility of a fine <br /> and/or imprisonment for known violations. (HSC 25191) <br /> Name: Jose Hernandez le; Environmental Compliance Tech. <br /> Signatur Date: 05/28/2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.