Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Srte Address MANTECA CHEVRON—1245 N MAIN ST MANTECA.CA <br /> N'R <br /> KEY <br /> A=NNLLtRSensor <br /> F=FILLS <br /> V=1.42OR <br /> P=PROBE <br /> L=Turbine Leak Detector <br /> . . . . . . . . . . . . . . . . %=SL'Jfp SENSOR <br /> B=Brine Sensor <br /> S=Smart Sensor <br /> C=Floats Chains <br /> E=£Stop <br /> a a o <br /> ,-G1 DSL 91 S- <br /> . }LS <br /> TP S t TP S O TP <br /> �S t ` <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . *PIPL�G+ <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Dravwing of Piping <br /> . . . . . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . exit of sump and <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> UDC's.\o <br /> underground <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . draningis <br /> d►p•itara rrrdrrgrorefl that are not iisible to the coni ling whnidan are a accurate,nine <br /> p gjessiarl opricn or+(i aryl oe sde�i fa i►�ornvtianl papx�a.Drmrig cannot speculate <br /> wrtosede blue fes' <br /> Date map was drawn:5119!21 <br /> Instructions <br /> If you already have a diagram that shows all required information.you may include it rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,d installed:monitoring system control panels:sensors monitoring tank <br /> annular spaces.sumps,dispenser pans.spill containers,or other secondary containment areas:mechanical or electronic line leak detectors:and in-tank liquid level <br /> probes(if used for leak detection). In the space provided.note the date this Site Plan was prepared. <br /> Page 6 of 6 <br />