My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2300 - Underground Storage Tank Program
>
PR0231522
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2021 11:09:40 AM
Creation date
5/3/2021 8:47:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231522
PE
2361
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page s of 6) <br /> XVII. FILL RISER SUMP TESTING INFORMATION <br /> Manufacturer Identify Tank ID from section III for each Manufacturer <br /> N/A A ❑ B ❑ C ❑ D ❑ <br /> A ❑ B ❑ C ❑ D ❑ <br /> Test Method Used: <br /> ❑Manufacturer Guidelines: (Specify) <br /> ❑ Industry Code or Engineering Standard:(Specify) <br /> ❑ Engineered Method:(Specify) <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Fill Riser Sump Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> XVlli. COMMENTS <br /> Provide any additional comments here. <br /> no fill sum <br /> XIX. VENT 1 TRANSITION PIPING SUMP TESTING INFORMATION <br /> Manufacturer Identify Vent I Transition Sump ID from <br /> section III for each Manufacturer <br /> NIA a ❑ IbEl c ❑ IdEl <br /> a ❑ I b ❑ I CO I d ❑ <br /> Test Method Used: <br /> ❑Manufacturer Guidelines:(Specify) <br /> ❑ Industry Code or Engineering Standard: (Specify) <br /> ❑ Engineered Method:(Specify) <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages <br /> Vent I Transition Piping Sump Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> XX.COMMENTS <br /> Provide any additional comments here. <br /> No transition sumps <br /> ID=Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.