My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2300 - Underground Storage Tank Program
>
PR0231522
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2021 11:09:40 AM
Creation date
5/3/2021 8:47:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231522
PE
2361
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix B <br /> 71,90 Overfill halve In Tank Shut Og-Le-vel <br /> l�Tartcsheet - <br /> Important:This is Meant to be a suppiernenfai -- <br /> WOrIC$heet Bled not:a subsMate to following the <br /> irFstal€a t'a;�manual M5a"ctlons.All length <br /> 2 <br /> Mengurnma its arc in h-mbes-Pleases confactise <br /> Authotitj Hving jurisdic`on[AH,) and review <br /> 10r,al,stater and national codes io determine the <br /> reguintory require mentis rgoverning smut:-off ^_[ I-- <br /> eapacily in your region,as well as tke-into - = <br /> account Other considerations such as eidreme <br /> tank lift, (D) <br /> With valve installed in the tank take the i'otiawing Ups f <br /> measurements: - Length <br /> Distance from the 71SO inlet tube flange to the cast - <br /> lug in the 71SO body(see figures). upper tube. � <br /> length.Note:the Upper Tune Length must be at <br /> feast 16"tv inclUde the proteotive band in the tuber � � l9a e <br /> b eUom of <br /> Distance fromthe 71SO inlet tube flar;ge to the tap � ` cut <br /> and bottom of louver tube.valve length. tB) t <br /> (YU) L To Tank ` <br /> (U) Bottom e <br /> (YI <br /> Distance from the 71SO inlettube flange to the :r Tank <br /> bottom Qrthe tank. Nc te:If a tank bottOM pioteclor lug verve - - Chart <br /> is present it may be necessary to add this tWickness <br /> to dimension OP�16�11 6'lTP models add d.6"� t�O f _ volume <br /> Dipstick <br /> l _- Number <br /> From the tank calibration chart provided by tank � <br /> manufacturer find the dipstick number M which <br /> correspond to the 100%volume- - r <br /> (Y) _ - <br /> 1.To determine shut-orf percentage: _ <br /> Subtract upper tube length (D)from distance to <br /> tank bottom (B) t _ ► <br /> 00 =(D)--E©I -21_ [ `-f t - iso <br /> Using the tank calibration chart provided by the Dote: The over,ili valve must be installed per AHJ <br /> tank manufacturer determine the tank capacity ai requirements and all applicable local.state, and <br /> the calculated (X)dimension and the 100%volume national codes_ if overfill valve is set above the <br /> (Y) tank capacity_ allowable shin-off percentage the overfill.valve <br /> `"l j must be removed and replaced. For reference 4D <br /> ( � tat�lr mpaci�in gallons= [ r OFR part 280 Subpart 13 Sec9on 28020 overfill <br /> values.should be,set Toa rnwamum of 95%- <br /> (V) ink capac?ey in g2110ris <br /> �y i <br /> Capacity I s'}capaclGl 7t 109- `I q. jD <br />
The URL can be used to link to this page
Your browser does not support the video tag.