My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
2300 - Underground Storage Tank Program
>
PR0231111
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 8:57:42 AM
Creation date
5/4/2021 7:58:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231111
PE
2361
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
01
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M rnv --1 -0000 <br /> v � 0- iD = Nc <br /> O N 5� <br /> N� U) <br /> N — —. <br /> -n C-) 4t -0 <br /> O - O0 v W <br /> O Q77 <br /> CD O <br /> M <br /> = Underground Storage Tank CD <br /> N U) M OW <br /> Designated UST Operator Visual Inspection Report oN = o co <br /> 0 <br /> pate last N <br /> Yes No NA performed ( M �_ 00 <br /> 10. TESTING AND MAINTENANCE � � CD Ul <br /> Has monitoring system certification been completed within the past ® 0 8/2/2020 CD <br /> ff1 <br /> O -n <br /> 12 months? 0 6/2/2020 n CD <br /> Has spill container testing been completed within the past <br /> N CD 0 <br /> 12 months? 0 9/24/2018 O o <br /> N O <br /> Has overfill prevention equipmenE inspection been completed within ® O o <br /> the past 36 months? <br /> Has secondary containment testing been completed within the past © 10/31/2019 M Q <br /> O Z5 U) <br /> 36 months? ® © �. N O <br /> Has tank tightness testing been completed within required W Cp 00 <br /> timeframes? ® CD <br /> 0 <br /> ® N <br /> Has line tightness testing been completed within the required CD CD O <br /> O C7 C7 <br /> � <br /> timeframes? © Q 9/17/2020 _ <br /> O � O D <br /> Other Test 1 Maintenance: © N <br /> Other Test 1 Maintenance: O N <br /> © 0 W � <br /> Other Test 1 Maintenance: O Cn <br /> 11. FACILITY EMPLOYEE TRAINING Yes No N Q <br /> o � <br /> Have all individuals performing facility employee duties received the required facility <br /> employee training within the past 12 months? CD <br /> Cn <br /> 13. COMMENTS � O <br /> This section may be used to record comments or observations that are not current compliance N --I <br /> CD ZT <br /> deficiencies. CD <br /> 0 <br /> N W <br /> C N <br /> O o <br /> N N <br /> C:) <br /> W � <br /> Co <br /> N v <br /> CD <br /> O <br /> O <br /> 0 �0 <br /> l"D cc CD O <br /> Cn D <br /> Cn I <br /> � 3 C/) � <br /> All answers marked"No"must be described by the designated UST operator in Section 3. N o <br /> C:) co <br /> CD —. _ <br /> W <br /> Page 4 of 4 _ v <br /> O o' <br /> W <br />
The URL can be used to link to this page
Your browser does not support the video tag.