Laserfiche WebLink
Elite IV Contractors <br /> Date: 9/24 /2021 <br /> Inspection Request: <br /> October 01, 2021 Friday @ i:oo PM <br /> Inspection Site: SRoo83639 <br /> Quik Stop #39 <br /> 2285 E Fremont Street Stockton, CA 95205 <br /> Scope Of Work: Replace dispensers with Bravo Conversion frames installation. <br /> Cold start the monitoring panel. <br /> A) Inspections: Sensor functionality: Functionality of the monitoring <br /> system must be verified to ensure that monitoring has been restored to meet <br /> the requirements of Title 23 California Code of Regulations and the Health& <br /> Safety Code. A copy of the alarm history shall be printed prior to performing the <br /> cold start of the monitoring panel and made available at the time of EHD <br /> inspection. <br /> B) Verification of the dispenser footprints contained by the under-dispenser <br /> containment sumps (UDC's). Any potential leaks from piping within the <br /> dispensers. <br /> C) Visual inspection of the piping within the dispensers. <br /> Thank you, <br /> Deborahjones <br /> Administrative Assistant <br /> Elite IV Contractors <br /> dispatch@eliteiv.com <br /> (209)461-6337 (work) <br /> (209) 461-6342 (fax) <br /> Phone:(209)461-6337 Fax:(209)461-6342 I 2535 Wigwam Dr.Stockton,CA 952-05 <br /> Email:dispatch@eiiteiv.com <br />