My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
2300 - Underground Storage Tank Program
>
PR0231111
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 8:57:42 AM
Creation date
5/4/2021 7:58:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231111
PE
2361
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
01
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6 . OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) Gasoline - 91 <br /> Are both vent and tank riser piping 0 Yes 0 Yes 0 Yes Yes <br /> secondarily contained ? 0 No © No © No 0 No <br /> OPE Model 61SO <br /> What is the OPE response when © Shut off 0 Shut off 0 Shut off 0 Shut off <br /> activated ? Flow Flow Flow Flow <br /> (Check all that apply. ) 0 Restricts © Restricts 0 Restricts 0 Restricts <br /> Flow Flow Flow Flow <br /> 0 Audible © Audible 0 Audible 0 Audible <br /> Alarm Alarm Alarm Alarm <br /> 0 Visual Visual © Visual [M Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping 0 Yes * r] Yes * 0 Yes * © Yes * <br /> that may interfere with the OPE operation ? © No © No © No © No <br /> At what level in the tank is the OPE set to <br /> 80 . 25 <br /> activate ? Inches from bottom of tank <br /> What is the percent capacity of the tank at 94 , 79 % <br /> which the OPE activates ? <br /> Is the OPE in proper operating condition to 0 Yes r] Yes * 0 Yes * 0 Yes * <br /> respond when the stored substance © No © No [M No 0 No <br /> reaches the designated regulatory level ? <br /> 7 . SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results © Pass 0 Pass 0 Pass © Pass <br /> 0 Fail rl Fail [Cl Fail Fail <br /> 8 . COMMENTS <br /> Describe all answers marked "No " or "Fail" and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> * Mark here if: <br /> 0 Flow restrictors interfere with overfill prevention and equipment repairs required . <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In - Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.