Laserfiche WebLink
Port of Stockton 2 9 September 2005 <br />San Joaquin County <br />Area No. 3 <br />See comments addressing Area No. 2 regarding the grading of the soil to remove the sulfur pellets. It is <br />not clear what will be paved for the storage of reclaimed materials. More clarification shall be provided <br />on what constitutes reclaimed materials and that these materials are stored in such a manner that is <br />protective of groundwater quality. <br />Area No. 4: <br />See comments addressing Area No. 2 regarding the removal, storage and disposal of the sulfur pellets. <br />Area No. 5: <br />See comments addressing Area No. 2 regarding the removal, storage and disposal of the sulfur pellets. <br />Area No. 6: <br />See comments addressing Areas 1 and 2 regarding the grading of the soil and the wash down of the <br />conveyor. <br />By 27 September 2005, please provide a response to these comments such that your winterizing plan <br />can be in place by 15 October 2005. <br />f you 1have any, questions, please contact me at 916-464-4676. <br />a- 6 <br />MOLLY M. WHITE <br />Water Resources Control Engineer <br />Enclosure(s) <br />cc: Jami Aggers, San Joaquin Valley Air Pollution District, Modesto <br />Margaret Lagorio, San Joaquin County Environmental Health Department, Stockton <br />Mr. Jeff Kasper, Deputy Director, Port of Stockton <br />Mr. Jeffrey Wingfield, Jones and Stokes, C/O Port of Stockton, Stockton <br />Mr. Chuck DeJong, Plant Manager. H.J. Baker & Bro., Inc., Stockton <br />Mr. Dave Wilkey, General Manager, Bay Sulfur, Stockton