My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0527808
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 11:16:36 AM
Creation date
5/4/2021 10:15:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527808
PE
2960
FACILITY_ID
FA0018851
FACILITY_NAME
PORT OF STOCKTON-ROUGH & READY ISLAND
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 <br />Maritime Laydown Site Wells/Piezometers <br />Well or <br />Piezometer <br />ID <br />Associated Site <br />ID <br />Installed By and Status Date Installed <br />Unknown Kleinfelder 8/18/86 <br />.6 <br />Ground Water <br />Elevation <br />i (2/14/11) <br />- <br />Ground <br />surface <br />Elevation <br />Top of <br />Casing <br />Elevation <br />Screened <br />Interval <br />Filter Pack <br />Interval Last use Reason for removal <br />(fe-eotm1sI) (feet MSL) (feet MSL) (feet bgs) (feet bgs) <br />P-101 7 2.5 4 5.18 3.0 to 13.0 2.5 to 13.0 2000 Within project footprint; site closed, poor construction (see note 1); condition unknown. <br />P-102 7 Unknown Kleinfelder 8/28/86 nm 1.86 6.53 5.0 to 15.0 3.2 to 15.0 2000 Within project footprint; site closed; poor construction (see note 1); condition unknown. <br />P-104 7 Destroyed Kleinfelder 8/29/86 nm 0.05 5.1 5.0 to 15.0 2.510 15.0 1999 NA <br />P-105 7 Unknown Kleinfelder 8/29/86 -4.24 0.07 2.95 5.0 to 15.0 2.5 to 19.0 2000 Within project footprint; site closed; poor construction (see note 1); condition unknown. <br />P-179 IAS-08 Unknown TtEMI 5/29/98 -5.07 WA -1.84 5.0 to 10.0 4.5 to 11.5 2000 Site closed; condition unknown. <br />W-13 NA Unknown Kleinfelder 11/5/86 0.44 4.99 6.49 3.0 to 13.0 2.0 to 14.0 2000 No IR Site; condition unknown. _ <br />W-120 IAS-08 Unknown LFR 11/21/97 -4.37 -2.05 -2.48 10.5 to 14.2 9.0 to 15.0 2000 Site closed; condition unknown. <br />W-32 lAS-08 Unknown PRC 11/12/92 -5.41 -2.93 -2.5 10.0 to 15.0 9.5 to 15.3 2000 Site dosed; condition unknown. <br />W-234 7 Unknown LFR 4/20/99 -5.02 -2.95 -2.47 11.0 to 16.0 9.010 16.0 2000 Within project footprint; site closed. <br />W-235 7 Unknown LFR 4/20/99 -5.12 -2.9 -2.78 20.5 to 25.5 18.5 to 25.5 2000 Within project footprint site closed. <br />Notes: <br />1 <br /> Monitoring wells installed by Kleinfelder have stainless steel-wrapped screen and stainless steel risers. Complete well construction details are provided in the "Verification Portion of the Confirmation Study, Final Draft Report, <br />Naval Communication Station, Rough and Ready Island, Stockton, California. Volumes 1 through 5." (Kleinfelder 1988). <br />2 Piezometers installed by Kleinfelder are 1" PVC pipe hydraulically pushed into the soil, and completed with a seal in the upper 3 feet. Complete well construction details are provided in the "Verification Portion of the Confirmation <br />Study, Final Draft Report, Naval Communication Station, Rough and Ready Island, Stockton, California. Volumes 1 through 5." (Kleinfelder 1988). <br />Monitoring wells installed by LFR have PVC screens and risers. Complete well construction details for W-86 through W-156. W-209 through W-221, and W-231 are provided in the "Remedial Investigation Report Operable Unit 1, 3 NCTS Stockton, California" (TtEMI 1999b) Details for W-232 through W-312 will be provided in the upcoming Operable Unit 4 remedial investigation report. <br />4 Monitoring wells installed by TtEMI have PVC screens and risers. Complete well construction details are provided in the "Remedial Investigation Report Operable Unit 3, NCTS Stockton. California" (TtEMI 1999a). <br />Monitoring wells installed by PRC have PVC screens and risers. Complete well construction details are provided in the "Site Investigation Report, NCS Stockton, California" (PRC 1994). the "Technical Memorandum for Additional <br />5 Investigations at Sites 5A, IAS-9, and IAS-11 and Monitoring Well Decommissioning' (PRC 1996b). the "Technical Memorandum for Site 39, NCS Stockton, California" (PRC 1996c), and the "Technical Memorandum Limited <br />Investigation Site 3, Site 4, and IAS-11, NCS Stockton, California" (PRC 1997b). <br />nm not measured <br />bgs Below ground surface <br />IAS Initial Assessment Study <br />LFR <br />LFR Levine-Fricke <br />MSL Mean sea level <br />NA Not applicable <br />TtEMI Tetra Tech EM Inc.
The URL can be used to link to this page
Your browser does not support the video tag.