My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0527808
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 11:16:36 AM
Creation date
5/4/2021 10:15:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527808
PE
2960
FACILITY_ID
FA0018851
FACILITY_NAME
PORT OF STOCKTON-ROUGH & READY ISLAND
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
environmental cleanup and remediation of existing buildings and sites to <br />make them suitable to new development. <br />The cost of regular maintenance is more than four times the Port's current <br />budget for these expenditures, and extraordinary improvements such as <br />hazardous material abatement, roof reconstruction, and other structural <br />needs are un-funded. Based on estimates contained in the Development <br />Plan, the actual cost to remediate building deficiencies in all structures in the <br />Project Area could reach about $241 million as shown in Table B-4 below. <br />Additionally, County staff believes that the projected lease rates for those <br />buildings identified with high reuse potential will not net sufficient revenues to <br />support the cost of required improvements. It is unlikely that the private <br />sector or the public sector will have the ability to remediate these conditions <br />due to the prohibitive cost of reuse and rehabilitation of the existing <br />structures. <br />ESTIMATED RENOVATION COSTS TABLE B-4 <br />ROUGH AND READY PROJECT AREA <br /> <br />Total Building Square Footage <br />Estimated Renovation Cost/sqft 1/ <br />Total Renovation Cost <br /> <br />8,023,300 <br />30 <br />$ 240,699,000 <br /> <br />1/ Rough estimate from Entranco to upgrade existing building to <br />meet current building codes and standards <br />Source: RSG and Entranco <br />The presence of hazardous wastes and contamination are significant factors <br />that hinder the economically viable reuse or capacity of buildings or <br />properties, as its presence is a deterrent to reoccupation and the cost to <br />remediate contaminated areas is substantial. <br />According to the September 2003 Agreement, the Port is required to <br />undertake all environmental cleanups required for the reuse of the Project <br />Area. Without substantial investments the Port can only attract a limited list <br />of tenants hindering the Port's ability to effectively use the land and the <br />buildings to their highest and best use. The Development Plan concludes that <br />the Project Area is environmentally certified for industrial use and some <br />further remedial work is required. The property can be certified for other uses <br />than industrial use; however, more stringent environmental conditions will <br />apply. <br />According to the Forell/Elsasser Engineers, Inc. report, even though the <br />overall seismic resistance of the buildings appears to be quite favorable, <br />concern is expressed regarding the connection of the elements of the <br />buildings (walls, braces, and other structural members) to the overall <br />framework of the building. The vulnerability of these structures is not from <br />ROSENOW SPEVACEK GROUP, INC. REDEVELOPMENT AGENCY OF THE CITY OF STOCKTON <br />MAY 3, 2004 <br /> <br />ROUGH AND READY ISLAND REDEVELOPMENT PROJECT <br />- B-18 - PRELIMINARY REPORT
The URL can be used to link to this page
Your browser does not support the video tag.