Laserfiche WebLink
environmental cleanup and remediation of existing buildings and sites to <br />make them suitable to new development. <br />The cost of regular maintenance is more than four times the Port's current <br />budget for these expenditures, and extraordinary improvements such as <br />hazardous material abatement, roof reconstruction, and other structural <br />needs are un-funded. Based on estimates contained in the Development <br />Plan, the actual cost to remediate building deficiencies in all structures in the <br />Project Area could reach about $241 million as shown in Table B-4 below. <br />Additionally, County staff believes that the projected lease rates for those <br />buildings identified with high reuse potential will not net sufficient revenues to <br />support the cost of required improvements. It is unlikely that the private <br />sector or the public sector will have the ability to remediate these conditions <br />due to the prohibitive cost of reuse and rehabilitation of the existing <br />structures. <br />ESTIMATED RENOVATION COSTS TABLE B-4 <br />ROUGH AND READY PROJECT AREA <br /> <br />Total Building Square Footage <br />Estimated Renovation Cost/sqft 1/ <br />Total Renovation Cost <br /> <br />8,023,300 <br />30 <br />$ 240,699,000 <br /> <br />1/ Rough estimate from Entranco to upgrade existing building to <br />meet current building codes and standards <br />Source: RSG and Entranco <br />The presence of hazardous wastes and contamination are significant factors <br />that hinder the economically viable reuse or capacity of buildings or <br />properties, as its presence is a deterrent to reoccupation and the cost to <br />remediate contaminated areas is substantial. <br />According to the September 2003 Agreement, the Port is required to <br />undertake all environmental cleanups required for the reuse of the Project <br />Area. Without substantial investments the Port can only attract a limited list <br />of tenants hindering the Port's ability to effectively use the land and the <br />buildings to their highest and best use. The Development Plan concludes that <br />the Project Area is environmentally certified for industrial use and some <br />further remedial work is required. The property can be certified for other uses <br />than industrial use; however, more stringent environmental conditions will <br />apply. <br />According to the Forell/Elsasser Engineers, Inc. report, even though the <br />overall seismic resistance of the buildings appears to be quite favorable, <br />concern is expressed regarding the connection of the elements of the <br />buildings (walls, braces, and other structural members) to the overall <br />framework of the building. The vulnerability of these structures is not from <br />ROSENOW SPEVACEK GROUP, INC. REDEVELOPMENT AGENCY OF THE CITY OF STOCKTON <br />MAY 3, 2004 <br /> <br />ROUGH AND READY ISLAND REDEVELOPMENT PROJECT <br />- B-18 - PRELIMINARY REPORT