My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0527808
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 11:16:36 AM
Creation date
5/4/2021 10:15:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527808
PE
2960
FACILITY_ID
FA0018851
FACILITY_NAME
PORT OF STOCKTON-ROUGH & READY ISLAND
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Report Type Monitoring Monitoring Period Reporting Due Date <br />Frequency/Schedule <br />Semiannual Quarterly and Semiannual 1 January <br />1 April <br />1 July <br />1 October <br />31 March <br />30 June <br />30 September <br />31 December <br />31 July <br />31 July <br />31 January <br />31 January <br />Facility—specific January January 31 July <br />Facility—specific July July 31 January <br />Annual 1 January — 31 December 31 January <br />REVISED MONITORING AND REP 'ING PROGRAM ORDER NO. R5-2008-^-'9 -8- <br />HJ BAKER & BRO. INC., MARTIN C,. tATING PARTNERSHIP, THE PORT 0 OCKTON, <br />I AND METROPOLITAN STEVEDORE <br />MOLTEN SULFUR PROCESSING PLANTS <br />SAN JOAQUIN COUNTY <br />A. Reporting Due Dates <br />The following table provides the due dates for submittal of reports. <br />Table A <br />Reporting Due Dates <br />B. Semiannual Monitoring Reports <br />Any semiannual monitoring report must include the transmittal letter, signed certification <br />statement, water quality data, field data, the Port's facility-specific tunnel monitoring, and <br />observation collected during the reporting period. Reports must be submitted per the Reporting <br />Due Dates in Table A of Section A, above. Semiannual monitoring reports must include the <br />results of all monitoring performed for the monitoring period, in addition to the information listed <br />below: <br />Semiannual monitoring reports must be submitted in hard copy; <br />The Discharger must report the surface water monitoring results. If no surface water was <br />present during the monitoring period, then this information must be included in the <br />semiannual report; <br />The Discharger must include the Port's facility-specific monitoring and analysis of the <br />tunnel water. If the tunnel was dry, then this information must be included in the <br />semiannual report; <br />The Discharger must report the groundwater flow rate, gradient, and direction in the <br />uppermost aquifer, in any zones of perched water, and in any additional zone of
The URL can be used to link to this page
Your browser does not support the video tag.