My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0527808
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 11:16:36 AM
Creation date
5/4/2021 10:15:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527808
PE
2960
FACILITY_ID
FA0018851
FACILITY_NAME
PORT OF STOCKTON-ROUGH & READY ISLAND
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GROUND WATER INVESTIGATION WORK PLAN <br />BULK TERMINALS SITE, PORT OF STOCKTON, STOCKTON, CALIFORNIA <br />Table of Contents <br />SECTION PAGE <br />INTRODUCTION 1 <br />BACKGROUND AND PREVIOUS INVESTIGATION 1 <br />2.1 Operation of The Bulk Terminals Site 1 <br />2.1.1 Historical Operations — Sulfur Prill 3 <br />2.1.2 Historical Operations — Coal and Petroleum Coke 3 <br />2.1.3 Historical Operations — Copper Concentrate 4 <br />2.2 Previous Soil And Groundwater Investigation 4 <br />2.2.1 Soil sampling results - 1991 4 <br />2.2.2 Ground water sampling results - 1991 5 <br />2.2.3 Ground water sampling results - 2003 5 <br />2.3 Geologic and Hydrogeologic Setting 6 <br />2.3.1 Regional Setting 6 <br />2.3.2 Local Geologic Setting 6 <br />2.3.3 Local Hydrogeologic Setting 6 <br />PROPOSED SCOPE OF WORK 7 <br />3.1 Phase 1: Hydrogeologic Characterization 8 <br />3.1.1 Task 1: Permitting, Utility Clearance, and Health & Safety Plan 8 <br />3.1.2 Task 2— Boring Advancement and Sample Collection 8 <br />3.1.3 Task 3 — Sample Analyses 13 <br />3.1.4 Task 4— Data Evaluation and Monitor Well Recommendations 15 <br />3.2 Phase 2 — Monitor Well Installation and Quarterly Ground Water Monitoring 15 <br />3.2.1 Task 5 — Utility Location, Permitting, and Health and Safety Plan 15 <br />3.2.2 Task 6 - Monitor Well Installation 15 <br />3.2.3 Task 7 — Quarterly Ground Water Monitoring 17 <br />3.2.4 Task 8 — Technical Report 17 <br />REFERENCES 19 <br />DISTRIBUTION LIST 20 <br />July 2005 Page ii Environmental Risk Services Corp.
The URL can be used to link to this page
Your browser does not support the video tag.