My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0527808
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 11:16:36 AM
Creation date
5/4/2021 10:15:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527808
PE
2960
FACILITY_ID
FA0018851
FACILITY_NAME
PORT OF STOCKTON-ROUGH & READY ISLAND
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California gional Water Quality Con 4 I Board <br />Central Valley Region <br />Karl E. Longley, ScD, P.E., Chair <br />Linda S. Adams <br />Secretary for <br />Environmental <br />Protection <br />11020 Sun Center Drive #200, Rancho Cordova, California 95670-6114 <br />Phone (916) 464-3291 • FAX (916) 464-5 <br />http://www.waterboards.ca.gov/centrajv,,4 <br /> <br />Arnold <br />Schwarzenegger <br />Governor <br />3 July 2009 <br />Jeff Kasper, Deputy Director <br />Port of Stockton <br />P.O. Box 2089 <br />Stockton, CA 95201-2089 <br />JUL 0 6 2009 <br />ENVIRONMENT HEAL* <br />PERMIT/SERVICES <br />Steven Arnett, Plant Manager <br />Martin Midstream Partnership <br />P.O. Box 982 <br />Stockton, CA 95201 <br />REVIEW OF OPERATIONS AND MAINTENANCE PLAN AND <br />CERTIFICATIONS/VERIFICATIONS, MARTIN OPERATING PARTNERSHIP, <br />SAN JOAQUIN COUNTY <br />The Central Valley Regional Water Quality Control Board (Regional Water Board) staff has <br />reviewed the Operations and Maintenance Plan and certifications/verifications received on 30 <br />June 2009 from Martin Operating Partnership (Discharger). The Discharger is regulated under <br />Cleanup and Abatement Order (CAO) No. R5-2008-0707 for a sulfur processing plant. <br />The Discharger's operations and maintenance plan included forms to document the annual <br />inspections, a log for recording leak detection test results, a log to schedule maintenance and <br />repairs on equipment that fail leak detection test, measures to prevent prill from discharging <br />outside the storage area, and measure to prevent the formation of acidic ponded surface <br />water outside the prill storage area. <br />The certification/verification included a signed statement that windscreens have been installed, <br />the sumps and basins have been coated, sumps and conveyance systems have passed leak <br />detection tests, the east wail has been repaired to match the existing height of the west wall, <br />and that prill stockpiles do not and will not exceed the height of the windscreens. <br />Based on review, staff notes that the Discharger's operations and maintenance plan satisfies <br />the requirements as ordered in Section 2.0 (page 7) of the CAO. And, the Discharger's <br />certifications/verification statements meet the requirements ordered in Sections 3.a—e of the <br />CAO (page 7). Therefore, the operations and maintenance plan and the <br />certifications/verification are complete and are approved by the Regional Water Board staff. <br />California Environmental Protection Agency <br />Recycled Paper
The URL can be used to link to this page
Your browser does not support the video tag.