My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0009227
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 11:41:48 AM
Creation date
5/4/2021 11:20:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0009227
PE
2960
FACILITY_ID
FA0004039
FACILITY_NAME
METROPOLITAN STEVEDORE
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
City
STOCKTON
Zip
95203
APN
145030010
CURRENT_STATUS
01
SITE_LOCATION
2201 W WASHINGTON
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kevin J. Brown <br />Project Manager <br />1Z DAMES & MOORE A RROF ESSION AL LIMITED PARTNhRSHIP <br />8801 FOLSOM BLVD., SUITE 200, SACRAMENTO, CA 95826 (916) 387-8800 <br />FAX NO. (916) 387-0802 <br />December 20, 1991 <br />Metropolitan Stevedore <br />720 East E Street <br />Wilmington, CA 90748 <br />Attention: Mr. Al Gamier <br />Re: Baseline Investigation Report <br />Delta Bulk Terminals Facility <br />Parcel III <br />Port of Stockton, California <br />Project No. 12650-009-044 <br />Dear Mr. Gamier: <br />Enclosed please find five copies of the above referenced report. This report was prepared under <br />the terms and conditions described in Dames & Moore's May 10, 1991 Phase II Site Investigation <br />proposal. Included in this report is a discussion of the scope of services performed, site geologic and <br />hydrogeologic conditions, procedures used during the investigation, findings of the investigation, and our <br />conclusions and recommendations. <br />As requested by Metropolitan Stevedore, separate reports have been prepared for Parcels I and <br />II collectively, and for Parcel III individually. As some of the discussion in the reports is common to <br />all three Parcels, some of the text is identical in each of the reports. <br />If you have any questions or comments regarding this report, please contact either of the <br />undersigned at 916/387-8800 <br />Sincerely, <br />DAMES & MOORE <br />William R. Short, CEG <br />Senior Geologist <br />December 20, 1991 <br />SAC28.013 <br />OFFICES WORLDWIDE
The URL can be used to link to this page
Your browser does not support the video tag.