My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0009227
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 11:41:48 AM
Creation date
5/4/2021 11:20:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0009227
PE
2960
FACILITY_ID
FA0004039
FACILITY_NAME
METROPOLITAN STEVEDORE
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
City
STOCKTON
Zip
95203
APN
145030010
CURRENT_STATUS
01
SITE_LOCATION
2201 W WASHINGTON
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14rt----- DAMES & MO ORE A PROFESSIONAL LIMITED PARTNERSHIP <br />8801 FOLSOM BLVD., SUITE 200, SACRAMENTO, CA 95826 (916) 387-8800 <br />FAX NO. (916) 387-0802 <br />August 1, 1991 <br />San Joaquin County <br />Public Health Services <br />445 N. San Joaquin Street <br />Stockton, CA 95201 <br />Attention: Ms. Laurie Cotulla <br />Re: Delta Bulk Terminals <br />2201 West Washington Street <br />Stockton, CA 95201 <br />Project No. 12650-009-044 <br />Dear Ms. Cotulla: <br />As instructed by Eleanor Ratliff, I am forwarding you the following: <br />Check No. 044-08383 in the amount of $248.00 for the permit application fee, and for <br />Work Plan review; <br />A completed Site Mitigation Acknowledgement/Request For Services form; <br />A completed in triplicate Application For Permit; <br />A completed Request For Priority Review form; and <br />A copy of the Work Plan for Phase II Investigation Work at the above referenced facility. <br />The work to be performed at the above referenced facility is a limited subsurface investigation <br />for the purpose of establishing baseline conditions prior to the expansion of the facility. This work is <br />not being required by any regulatory agency. <br />Drilling activities at the facility are tentatively scheduled to begin during the week of August 19, <br />1991. Construction activities at the facility will be beginning soon and it is critical that we perform our <br />field activities in an expedifous manner. We respectfully request your priority review of these materials <br />c'f ' so that we may begin by 19, 1991. <br />PERMIT.LTR <br />OFFICES WORLDWIDE
The URL can be used to link to this page
Your browser does not support the video tag.