Laserfiche WebLink
APPENDIX A <br />THE TWINING LABORATORIES, INC <br />STANDARD OPERATING PROCEDURES <br />This appendix contains the standard operating procedures used by The Twining Laboratories, Inc. <br />(Twining) in performing investigations. Twining observes these procedures in order to obtain <br />consistent, reliable data. The procedures used for this investigation included the following. <br />Standard Operating Procedures for Hand Angering and Soil Sampling <br />Subsurface assessment permits, if required, are filed with the appropriate regulatory agencies prior <br />to conducting field operations. Field activities are performed under the supervision of a California <br />registered environmental assessor II. Sampling equipment is thoroughly cleaned before, during, and <br />after each use according to Twining's "Standard Operating Procedures for Equipment <br />Decontamination". <br />Hand auger soil borings are between 1.5 and 3.0 inches in diameter depending upon the size of the <br />auger. These soil borings are advanced by turning the hand auger handle repeatedly which causes <br />the auger bit to cut into the soil. After approximately 6 inches of advance, the bucket of the auger <br />fills with soil cuttings and it is then removed from the borehole and the cuttings are emptied. The <br />auger is then replaced in the borehole to advance another 6-inch interval. In this manner the <br />borehole is extended to the designated sampling depth. <br />Soil samples are collected from hand auger soil borings by lowering a soil sampler equipped with <br />a stainless-steel retention sleeve into the undisturbed soil at the bottom of the borehole. The soil <br />sampler is then driven approximately 6 inches using a slide hammer. <br />The soil borings are abandoned by grouting with a 6-sack cement slurry containing 3 to 5 percent <br />bentonite, or backfilling with clean soil. Abandonment procedures depend upon the boring depth, <br />depth to groundwater, project objectives, and regulatory requirements. <br />Soil cuttings generated during hand augering are either replaced in the borings, or stockpiled, <br />depending upon project requirements. Stockpiled soil is containerized in United States Department <br />of Transportation-approved drums, or placed on and covered with plastic sheeting, and stored on site <br />in an area inaccessible to the general public. Typically, the stockpiled soil is characterized by <br />collecting and analyzing composite samples from the stockpile. Twining can recommend an <br />appropriate method for disposition of stockpiled soil based on the analytical results. Disposal will <br />be the responsibility of the client. <br />Equipment Decontamination: Proper decontamination procedures reduce the potential for: cross- <br />contamination among sample locations; and introduction of contamination from outside sources. <br />Before, during, and following drilling operations, drilling equipment is thoroughly cleaned using a <br />high pressure hot water (steam) washer. Well casing, screen, end caps, and centralizers will also be <br />cleaned using the steam washer.