My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7373
>
2900 - Site Mitigation Program
>
PR0537728
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 4:31:02 PM
Creation date
5/4/2021 4:26:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0537728
PE
2950
FACILITY_ID
FA0021746
FACILITY_NAME
KAISER PERMANENTE
STREET_NUMBER
7373
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
9510
APN
09416023
CURRENT_STATUS
01
SITE_LOCATION
7373 WEST LN
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
adre <br />associates, inc. <br />El3 ENGINEERS, GEOLOGISTS & ENVIRONMENTAL SCIENTISTS <br />April 18, 2013 <br />Project No. 1301-0621 <br />Petro-Analytical, Inc. <br />Post Office Box 2301 <br />Orinda, California 94563 <br />Attention: Mr. K.W. 'Bud' McCuaig <br />President <br />Subject: Technical Work Plan/Site Health and Safety Plan, Soil Assessment Activities <br />Related to the Removal of Fuel Oil Piping at the Kaiser Permanente Facility,7373 <br />West Lane, Stockton, San Joaquin County, California. <br />Dear Mr. McCuaig: <br />Padre Associates, Inc. (Padre) is pleased to present the attached Technical Work <br />Plan/Site Health and Safety Plan (TWP/HSP) to complete soil assessment activities in support <br />of the removal of fuel oil piping at the Kaiser Permanente facility, 7373 West Lane, Stockton, <br />San Joaquin County, California (Project Site). Padre understands that the piping is situated <br />underground within 4-inch diameter secondary piping, is approximately 175 feet long, and is <br />used to supply fuel oil to an existing emergency power generator. <br />Padre appreciates the opportunity to provide environmental services to Petro-Analytical, <br />Inc. If you have any questions or require additional information, please contact us. <br />Sincerely, <br />PADRE ASSOCIATES, INC. <br />Alan Churchill <br />Project Geologist <br />K. <br />Jerome K. Summerlin, C.E.G., C.Hg. <br />Principal Geologist <br />3020 Explorer Drive, Suite 5 • Sacramento, California 95827 • 916-857-1601 • Fax 916-857-1602
The URL can be used to link to this page
Your browser does not support the video tag.