My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1992-1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1992-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 4:34:37 PM
Creation date
5/7/2021 8:39:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1992-1993
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AS 191NL <br /> File No. 20-1008-49.1 W k%J K L E I N F E L D E R <br /> December 8, 1992 <br /> CONSTRUCTION SPECIFICATIONS FOR TEST PAD <br /> HA LANE LANDFILL <br /> SAN JOAQUIN COUNTY, CALIFORNIA <br /> PURPOSE AND SCOPE <br /> The primary purpose of the test pad will be to verify that the specified moisture/density and <br /> permeability characteristics, determined in the laboratory, are achievable in the field, under <br /> field construction conditions. A secondary purpose of the test pad will be to adjust <br /> construction techniques and procedures under the direction of the Engineer to economically <br /> achieve a finished and compacted barrier layer conforming to applicable State regulations. <br /> Adjustments may include but not limited to: <br /> • any construction methods of soil and/or clay placement <br /> • methods of water addition <br /> • mixing methods <br /> • compaction methods <br /> • type of construction equipment used <br /> • methods of grade control <br /> The contractor is to use the same type of equipment in the construction of the test pad as will <br /> be used in construction of final cover including spreading, mixing and compacting equipment. <br /> Test pad construction is to proceed under the direction of the Engineer and the observation <br /> of the CQA Engineer and third party CQA monitor. <br /> The test pad will consist of three adjacent strips, each composed of one of the major identified <br /> soil types (ML, SM, or SM/SP). Field density testing for compaction control and field and <br /> laboratory permeability testing will be conducted. Field and laboratory permeability testing <br /> will include one sealed, double ring infiltrometer test performed on the test strip composed <br /> of relatively clean sandy soil (SM/SP). A laboratory permeability test obtained from a block <br /> sample from each of the three test strips will be performed. In addition, all other tests <br /> outlined on Table 7-3 of the CQA Plan will be completed. <br /> Copyright 1992 Kleinfelder, Inc Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.