Laserfiche WebLink
Rim Schwab <br /> January 28, 1992 <br /> Page 7 <br /> is $380 per acre while example estimates for seed, fertilizer, and <br /> mulch range from $1000-1500 per acre. " <br /> Response: <br /> The cost estimate section has been revised to show costs for seed, <br /> fertilizer, and mulch based on an existing San Joaquin County <br /> hydroseeding contract. <br /> Comment 22: <br /> "The operator will be required to amend the closure and postclosure <br /> maintenance plans, upon approval and completion of the gas <br /> monitoring system, to reflect the actual rather than proposed <br /> implementation activities. The gas plan may be submitted as a <br /> supplemental document to the final plans. In addition, state that <br /> the Board as well as the LEA will receive quarterly monitoring <br /> reports. " <br /> Response: <br /> The gas implementation plan is included as Appendix F of the <br /> Closure Plan. in addition, sheet 3 of the drawings has been <br /> revised to show actual rather than proposed monitoring well <br /> locations. The Closure and Postclosure Plans have been revised to <br /> state that quarterly reports will be sent to the LEA and the Board. <br /> Comment 23: <br /> "The closure and postclosure maintenance plans must include <br /> atmospheric temperatures (14 CCR 17783 .13 (a) (3) ) as part of the <br /> monitoring report minimum requirements." <br /> Response: <br /> The closure and postclosure maintenance plans have been revised to <br /> include atmospheric temperatures when reporting results of landfill <br /> gas monitoring. <br /> Comment 24: <br /> "Section III-3 .2 . Revise text to state that ground water quarterly <br /> reports shall also be forwarded to the Board. " <br />