Laserfiche WebLink
Structure monitoring of the farm labor camp will continue on a <br /> quarterly basis if allowed by the Housing Authority. Therefore, <br /> the next monitoring event is scheduled for December 11, 1992 . <br /> ON SITE STRUCTURES <br /> The scale house and office/maintenance shed were monitored for <br /> methane on 9/22/92 . In both structures, the methane reading was <br /> approximately 20 ppm. The three monthly events for on-site <br /> structures have been completed. Monitoring will continue on a <br /> quarterly basis. <br /> GAS PROBE MONITORING <br /> The County performed the fifth gas probe monitoring event at the <br /> Harney Lane Sanitary Landfill on 9/18/92 and 9/22/92. On 9/18/92 , <br /> the County recorded probe monitoring results for the first six <br /> wells. On 9/22/92, the County finished the remainder of the wells. <br /> Methane levels were similar to previous monitoring events. Table <br /> 2 shows the probe monitoring results. <br /> The final monthly probe monitoring event is scheduled for October <br /> 20, 1992 . The monitoring will continue after October 20, 1992 on <br /> a quarterly basis. <br />