Laserfiche WebLink
: �PR7IM <br /> 1917 <br /> . <br /> WILLIAM J. WARD Y �_ �RjOO�UGHTON LONG <br /> JQ, <br /> DIRECTOR OF PUBLIC WORKS •O••. �P UIN �OC'BDS[NESS MANAGER <br /> q�iFoar' SAN ©`� p�STRtCT <br /> TOM M. IWAMIYA �{�ALTN <br /> ASST. DIRECTOR OF PUBLIC WORKS DEPARTMENT OF PUBLIC WORKS 1810PE HAZELTON AVE. <br /> JACK L. NAVONE TELEPHONE 944-2281 <br /> DEPUTY DIRECTOR.TRAFFIC ENGINEER ST O C KT O N, CALIFORNIA 9 5 Z O t AREA CODE 209 <br /> April 4, 1977 <br /> M E M O R A N D U M <br /> TO: J. Don Layson, M.P.H. , Director <br /> Environmental Health Division <br /> FROM: W. J. Ward, Director <br /> By: W. L. Cypher, Maintenance Superintendent . ;/''` <br /> SUBJECT: HARNEY LANE DISPOSAL SITE <br /> YOUR INSPECTION REPORT DATED 3-21-77 <br /> 7 <br /> Due to minimum funds and maximum efficiencv. <br /> the Harney Lane Land= is being o e wi ac.e uate but <br /> minimum equipment to comply with Landfill regulations. One <br /> AC'21 landfill bulldozer spreads and complacts refuse as it <br /> is delivered to the site. The distributed ground pressure <br /> of this tractor is adequate to obtain necessary density of <br /> material. <br /> One 9-cubic yard self-loading scraper is assigned <br /> to the Landfill site to stockpile; cover material to be spread <br /> by the bulldozer. A small rubber tire Ford tractor equipped with <br /> a bulldozer blade is utilized for cleaning the refuse disposal <br /> area. <br /> A backup D6 bulldozer is maintained at the site to <br /> temporarily spread and compact the refuse when the large tractor <br /> is unavailable due to maintenance and breakdowns. When it appears <br /> the large bulldozer is out of service for a period exceeding 3 <br /> days, a standard bulldozer is leased as its replacement. <br /> Excluding breakdowns of equipment, the site is <br /> being conducted in a manner to spread and compact refuse and to <br /> cover with a 6 inch layer of dirt daily. Under normal operation <br /> the refuse is being spread in a confined area suitable for cover <br /> daily. An all-weather road to the face of the refuse discharge <br /> point will be constructed prior to 9-15-77. <br /> WLC:cz <br />