My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
3000 – Underground Injection Control Program
>
PR0009077
>
SITE INFORMATION AND CORRESPONDENCE_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2021 3:15:46 PM
Creation date
5/11/2021 1:18:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
PRE 2019
RECORD_ID
PR0009077
PE
2960
FACILITY_ID
FA0004038
FACILITY_NAME
ARCO BULK FACILITY
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1010
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br /> Well Construction Details <br /> Stockton Terminals Technical Committee <br /> Port of Stockton <br /> Stockton,California <br /> Ground TOC/ <br /> Current Former Coordinates Surface PVC Well Well Screen Filter Pack Bentonite <br /> Well Well Date Latitude Longitude Elevation Elevation Depth Diameter Top Bottom Length Top Top Comments <br /> I.D. I.D. Installed (feet,MSL) (feet,MSL) (feet,bgs) (feet,MSL) (inches) (feet,lags) (feet,MSL) (feet,bgs) (feet,MSL) (feet) (feet,lags) (feet,MSL) (feet,lags) (feet,MSL) <br /> TO/MW-1 07/16/92 37.9432584 -121.3331870 1.53 1.21 15 -13.47 2 5.1 -3.57 14.2 -12.67 9.1 4.5 -2.97 3.5 -1.97 <br /> TO/WC-1S 07/21/92 37.9434362 -121.3345207 2.98 2.89 14.4 -11.42 2 5.1 -2.12 14.2 -11.22 9.1 4.5 -1.52 3.5 -0.52 <br /> TO/WC-1 M 07/21/92 37.9434414 -121.3345092 2.83 2.69 29.8 -26.97 2 20.5 -17.67 29.7 -26.87 9.2 20.5 -17.67 19.5 -16.67 Steel conductor casing to 20 feel bgs <br /> TO/WC-1C 02/28/94 37.9434606 -121.3344729 2.84 2.33 50.7 47.87 4 41.5 -38.67 50.7 47.87 9.2 40 -37.17 35 -32.17 <br /> TO/WC-2B 03/02/94 37.9425942 -121.3342219 3.30 2.86 34.5 -31.20 4 29.5 -26.20 33.7 -30.40 4.2 27 -23.70 23.5 -20.20 <br /> TO/WC-2D 03/01/94 37.9425635 -121.3342466 3.23 2.47 1 90 -86.77 4 80 -76.77 89.8 -86.57 9.8 76.5 -73.27 72.5 -69.27 <br /> Santa Fe Paclfic/Southem Pacific Pipeline Wells <br /> SP-1 SP-1 02/27/88 37.9427877 -121.3348232 1.70 4.65 6 -4.30 12 2 -0.30 6 -4.30 4 <br /> SP-2 SP-2 02/27/88 37.9425472 -121.3345659 2.34 4.67 6 -3.67 12 2 0.34 6 -3.67 4 <br /> SP-3 SP-3 02/27/88 37.9422650 -121.3342642 2.64 5.29 6 -3.36 12 2 0.64 6 -3.36 4 <br /> SP-4 SP-4 02/27/88 37.9420404 -121.3340264 3.99 5.59 6 -2.01 12 2 1.99 6 -2.01 4 <br /> SP-5 SP-5 02/27/88 37.9418263 -121.3337978 3.33 6.18 6 -2.67 12 2 1.33 6 -2.67 4 <br /> SP/M-1 M-1 11/16/88 37.9414385 -121.3325768 2.34 29.5 4 3 28 25 3 2 <br /> SP/M-2 M-2 11/16/88 0.97 2.92 25 -24.03 4 5 -4.03 25 -24.03 20 3 -2.03 2.5 -1.53 Well Destroyed 1992 <br /> SP/M-3 M-3 11/17/88 37.9423262 -121.3323141 1.96 28 4 3 28 25 3 2 <br /> SP/M-4 M4 11/18/88 37.9419020 -121.3323095 2.07 30 4 3 28 25 2.5 2 <br /> SP/M-5 M-5 37.9416580 -121.3336404 1.65 20 5 16 <br /> SP/M-6 M-6 37.9422001 -121.3328775 1.32 20 5 16 <br /> SP/M-7 M-7 04/27/93 37.9419112 -121.3323389 2.66 43 4 28 43 15 27.5 26 <br /> SP/M-8 M-8 04/08/94 37.9416736 -121.3336065 1.69 39 4 29 39 10 27.5 26 <br /> SP/M-9 08/12/03 3.08 20 2 5 -1.92 20 15 <br /> SP/M-10 08/12/03 2.53 20 2 5 -0.47 20 15 <br /> SP/WC-15 07/22/9237.9422617 -121.3317911 4.00 6.90 19.2 -15.21 2 5.1 -1.11 19.2 -15.21 14.1 4.5 -0.51 3.5 0.50 <br /> SP/WC-1 M 07/22/92 37.9422535 1 -121.3317961 3.99 6.88 35 -31.01 2 30.4 -26.41 34.8 -30.81 4.4 27.5 -23.51 25 -21.01 Steel conductor casing to 20 feet bgs. <br /> Union Pacific Railroad wells <br /> UP/MW-1 I MW-' 06/03/88 37.9397904 -121.3316720 0.89 0.55 20 -19.11 4 10 -9.11 20 -19.11 10 8 -7.11 6 -5.11 <br /> UP/MW-2 MW-2 06/03/88 AM -1.77 20 -21.02 4 10 -11.02 20 -21.02 10 8 -9.02 6 -7.02 <br /> UP/MW-3 MW-3 06/03/88 -0.92 -1.8 20 -20.92 4 10 -10.92 20 -20.92 10 8 -8.92 6 -6.92 <br /> Unocal wells <br /> UO/MW-1 MW-1 06/15/88 3.88 3.11 17 -13.12 2 5 -1.12 15 -11.12 10 *465MO.39 <br /> 1.75 2.13 <br /> UO/MW-2 MW-2 06/15/88 3.62 3.18 15 -11.38 2 5 -1.38 15 -11.38 10 1.75 1.87 <br /> UO/MW-3 MW-3 06/16/88 1 3.37 16 -15.00 2 6 -5.00 16 -15.00 10 3 -2.00 Conductor casing to 7 feet bgs <br /> UO/MW-4 MW-4 06/16/88 1.35 -1.68 17 -15.65 2 5 -3.65 15 -13.65 10 1.75 -0.40 <br /> UO/MW-5 MW-5 06/17/88 2.05 4.51 12 -9.95 2 5 -2.95 12 -9.95 7 2 0.05 Conductor casing to 7 feet bgs <br /> UO/MW-6 MW-6 06/17/88 4.15 3.62 17 -12.85 2 6 -1.85 16 -11.85 10 2.5 1.65 Conductor casingto 6 feet bgs <br /> UO/MW-7 MW-7 06/17/88 4.11 3.61 17 -12.89 2 5 -0.89 15 -10.89 10 2 2.11 <br /> ST Services wells <br /> ACA-1A 09/14/06 37.9405570 -121.3304582 4.84 4.77 25 -20.17 2 15 -10.17 25 -20.17 10 13.5 -8.67 *2m51 <br /> ACA-1 B 10/27/06 37.9405780 -121.3304534 4.71 4.60 54 -49.29 2 44 -39.29 54 -49.29 10 41 -36.29 <br /> ACA-2A 09/13/06 37.9411638 -121.3300913 4.94 8.19 25 -20.06 2 15 -10.06 25 -20.06 10 13.5 -8.56 <br /> ACA-2B 10/27/06 37.9411386 -121.3300965 4.87 8.06 51 -46.13 2 41 -36.13 51 -46.13 10 36 -31.133 <br /> ST/MW-1 07/13/92 37.9410008 -121.3314171 2.29 6.35 18 -15.71 2 5 -2.71 18 -15.71 13 4.5 -2.21 <br /> ST/WC-1A 02/28/94 37.9414096 -121.3331123 4.34 4.19 19.6 -15.26 4 5.4 -1.06 19.2 -14.86 13.8 4 0.34 ST/WC-16 02/25/94 37.9413821 -121.3331482 4.38 3.90 31.5 -27.12 4 27 -22.62 31.2 -26.82 4.2 26 -21.622 <br /> ST/WC-1C 02/25/94 37.9413532 -121.3331867 4.17 3.60 54.5 -50.33 4 45 -40.83 54.2 -50.03 9.2 41 -36.83 37 -32.83 <br /> PS/P-11 P-11 01/87 37.9415447 -121.3309685 3.15 3.24 10 -6.85 1 5 -1.85 10 -6.85 5 <br /> PS/P-12 P-12 01/87 37.9412922 -121.3308605 3.74 3.94 10 -6.26 1 5 -1.26 10 -6.26 5 <br /> PS/P-13 P-13 01/87 37.9410289 -121.3307618 3.02 3.76 10 -6.99 1 5 -1.99 10 -6.99 5 <br /> PS/P-21 P-21 01/87 37.9404828 -121.3326736 3.32 4.41 10 -6.68 1 5 -1.68 10 -6.68 5 <br /> I:STTC\Tables\Well Construction Details.xls Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.