Laserfiche WebLink
Stantec <br /> April 30, 2010 <br /> Page 3 of 14 <br /> Reference: First Quarter 2010 Site Status, Groundwater Monitoring and Remedial Summary Report-Stockton <br /> Terminals Technical Committee Facilities <br /> (Section 4.3). Baseline metals samples were collected from monitoring wells TS-4R, TS-5, TS/M-2, <br /> and TO/T-3 as part of the HPI pilot study. Well locations are shown on Figures 2 and 3. Pre- and <br /> post-purge dissolved oxygen (DO) and oxidation reduction potential (ORP) readings were collected <br /> from the evaluation monitoring wells as part of the ozone-injection monitoring program. <br /> Groundwater sampling field data sheets are included in Appendix D. <br /> Stantec coordinated STTC monitoring and sampling efforts with those in the ST Services southern <br /> lease area through their consultant Ash Creek Associates, Inc. Twenty "A" zone wells, six "B" zone <br /> wells, eight "C" zone wells, and two "D" zone wells in the ST Services monitoring well network were <br /> monitored for depth to water on February 1, 2010 (Appendix E). <br /> First quarter purge water was temporarily stored in holding tanks on the Tesoro Terminal, pending <br /> removal from the Site. On February 3 and March 2, 2010, Stantec oversaw Instrat Inc. remove <br /> approximately 2,800 gallons and 3,700 gallons of purge water, respectively. The water was <br /> transported to the Instrat facility in Rio Vista for treatment and disposal. <br /> Regular O&M activities and system upgrades were conducted on the two ozone systems <br /> throughout first quarter 2010. O&M of the ozone system remains fairly significant, indicating that <br /> oxygen injection may present a less O&M intensive, more implementable alternative should the <br /> current system need augmentation in the future. <br /> As part of Tesoro's OI pilot study, wells TS/MW-3DR and TS/MW-4D were installed and developed <br /> during March 2010. Results will be presented under separate cover. <br /> Hydrogen peroxide injection and evaluation monitoring commenced during March 2010 as part of <br /> Tesoro's two-phase HPI pilot study. <br /> 3.0 GROUNDWATER RESULTS <br /> Wells gauged and sampled under the MRP during first quarter 2010 are listed in Table 1. Time <br /> plots were created for selected wells to evaluate long-term groundwater elevation trends, as well as <br /> TPHg, benzene and MTBE concentration trends (Appendix F). Non-detectable results are shown <br /> at their method reporting limits (MRLs) on the time plots. <br /> 3.1 GROUNDWATER GRADIENTS <br /> First quarter 2010 depth-to-water measurements were collected on February 1, 2010. Groundwater <br /> elevations, gradients, and flow directions in each of the zones were consistent with historical data <br /> (Tables 3 and 4). First quarter groundwater elevation contour maps for the "A", "B", "C", and "D" <br /> zones are provided as Figures 4 through 7, respectively. Ground surface elevation at the Site <br /> ranges from approximately 1.5 to 6.3 feet above mean seal level (msl). A summary of groundwater <br /> gauging and elevation data is presented in the table below. <br />