My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
3000 – Underground Injection Control Program
>
PR0009077
>
WORK PLANS_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2021 3:42:10 PM
Creation date
5/11/2021 1:28:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
WORK PLANS
FileName_PostFix
PRE 2019
RECORD_ID
PR0009077
PE
2960
FACILITY_ID
FA0004038
FACILITY_NAME
ARCO BULK FACILITY
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec Consulting Inc. <br /> 3017 Kilgore Road,Suite 100 <br /> Rancho Cordova,CA 95670 <br /> Tel: (916)861-0400 <br /> Fax: (916)861-0430 <br /> s: <br /> Stantec <br /> May 6, 2009 <br /> Mr. Brian Taylor <br /> Regional Water Quality Control Board —Central Valley Region <br /> 11020 Sun Center Drive, Suite 200 <br /> Rancho Cordova, California 95670-6114 <br /> Reference: Response Letter for RWQCB letter dated April 8, 2009 <br /> BP Terminal No. 40T <br /> Port of Stockton <br /> Stockton, California <br /> Stantec Project No.: 211601007.201.313 <br /> Dear Mr. Taylor: <br /> On behalf of Atlantic Richfield Company (ARC), a BP Affiliated Company, Stantec Consulting <br /> Corporation (Stantec) has prepared this Response Letter to address your April 8, 2009 <br /> Amended Bioremediation Pilot Study Work Plan Response Letter. <br /> You letter requests that a path forward be developed if BP chooses a different path. Stantec will <br /> evaluate other alternative clean up methods and will submit a work plan to the Regional Water <br /> Quality Control Board by June 19, 2009. <br /> If you have any questions, please call Rusty Benkosky at (916) 861-0400. <br /> OFESSION <br /> Sincerely, E B <br /> Stantec Consulting Corporation C, <br /> • ��- � C 583rn <br /> * EXP. 12/31/2010 <br /> Brian Westhoff Rusty Be/osky, P.E. <br /> Geologic Consultant Managing Principal Engineer sTgTFOFCAL,Fop�'\P <br /> ATTACHMENT <br /> cc: Mr. Sergio Morescalchi, Atlantic Richfield Company (upload to Enfos) <br /> Response Letter for RWQCB letter dated April 8,2009.doc 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.