My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
3000 – Underground Injection Control Program
>
PR0009077
>
WORK PLANS_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2021 3:42:10 PM
Creation date
5/11/2021 1:28:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
WORK PLANS
FileName_PostFix
PRE 2019
RECORD_ID
PR0009077
PE
2960
FACILITY_ID
FA0004038
FACILITY_NAME
ARCO BULK FACILITY
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM NO. R5-2008-0064 -2- <br /> 8P WEST COAST PRODUCTS <br /> ARCO/BP STOCKTON TERMINAL#40T <br /> ENHANCED BIOREMEDIATION PILOT STUDY <br /> SAN JOAQUIN COUNTY <br /> Constituents EPA Method Maximum Quantitation Limit Frequency <br /> Methyl Tertiary Butyl Ether 8260B 0.5 pg/I B <br /> Tertiary Butyl Alcohol 8260B 5 pg/I B <br /> Ferrous Iron (dissolved) SM 3500FeD 0.1 mg/L C <br /> Sulfide 376.2 0.1 mg/L C <br /> Nitrate (as NO3)and Sulfate 300.0 1 mg/L C <br /> Nitrite 300.0 1 mg/L C <br /> Total Nitrogen 4500-N 0.1 mg/L C <br /> Sodium 6010-13 or 200.7 1 mg/L C <br /> Ammonium (as NH3) 350.1 0.5 mg/L C <br /> Potassium 200.7 1 mg/L C <br /> Total Alkalinity 310.1 or SM2320B 5.0 mg/L C <br /> Total Hardness 130.2 1 mg/L C <br /> Total Dissolved Solids 160.1 or SM2540C 10 mg/L C <br /> Total Phosphorus and o-phosphate 300 0.15 mg/L C <br /> 1 For nondetectable results. <br /> A Every time a well is sampled. <br /> B Monthly while injection is occurring and quarterly after injection has ceased. <br /> C After injection,weekly during the first month of injection, monthly for the first six months after initiation of <br /> injection,and quarterly thereafter. <br /> mg/I Milligrams per liter <br /> µg/I Micrograms per liter <br /> B. FIELD MEASURED PARAMETERS <br /> Monitoring of the bioremediation pilot study shall include field measured parameters <br /> recorded from downgradient wells AR/MW-1 A, AR/MW-3A, AR/MW-5A, AR/MW-5B, <br /> AR/MW-5C, AR/MW-50, AR/MW-8A, AR/MW-8B, AR/MW-8C, AR/MW-10A, <br /> AR/MW-11A, AR/MW-12A, AR/MW-13A, AR/MW-13B, AR/MW-13C, AR/MW-23A, <br /> AR/MW-24A and upgradient well PS-P29 every time these wells are sampled. The <br /> field measured parameters to be recorded are listed in the following table. <br /> Constituents Units <br /> Electrical conductivity pmhos/cm <br /> PH pH units <br /> Oxidation-reduction potential millivolts <br /> Dissolved oxygen mg/L <br /> Bromide mg/L <br /> Temperature °F/°C <br /> Groundwater elevation Feet and hundredths, mean sea level <br /> Field testing instruments (such as those used to test oxidation-reduction potential and <br /> dissolved oxygen) may be used provided that: <br /> 1. The operator is trained in proper use and maintenance of the instruments; <br />
The URL can be used to link to this page
Your browser does not support the video tag.