My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSHIRE
>
734
>
2900 - Site Mitigation Program
>
PR0517342
>
WORK PLANS_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2021 4:23:05 PM
Creation date
5/11/2021 4:18:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
PRE 2019
RECORD_ID
PR0517342
PE
2950
FACILITY_ID
FA0013355
FACILITY_NAME
WAGNER LAND CO PROPERTY
STREET_NUMBER
734
STREET_NAME
WILSHIRE
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13320022
CURRENT_STATUS
01
SITE_LOCATION
734 WILSHIRE AVE
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan—Soil Boring InstmLiation Page 4 <br /> Wagner Land Company Property <br /> Project 301.2 <br /> June 13, 2001 <br /> It is anticipated that three groundwater samples submitted for analysis as follows: <br /> • Total Extractable Petroleum Hydrocarbons(TEPH) by EPA method 8015(m)/3510. <br /> • Total gasoline range Petroleum Hydrocarbons (TPH-G) by EPA method <br /> 8015(m)/5030. <br /> • Total Benzene, Toluene, Ethylbenzene, and Xylene by EPA method 602. <br /> • Chlorinated VOC's using EPA method 8010. <br /> • 5 contaminant heavy metals, lead, chromium, cadmium, nickel and zinc by EPA <br /> method 6010b. <br /> Detection Limits <br /> Compound TPH-Gas TEPH BTEX Metals Cl-VOC's <br /> Detection Limit 10 50 0.3 10-50 various <br /> Units L L L L L <br /> 3.0 REPORTING & TIME SCHEDULE <br /> The information gathered during this phase of work will be presented in a report, which will <br /> include a description of the field work, results of sample analyses, and their implications. The <br /> report will be prepared and signed by a registered geologist responsible for the work. <br /> The following summarizes the time schedule for the proposed work: <br /> Date Work to be Performed <br /> Week of June 25,2001 Receive Work Plan Approval/Prepare Well Permits&Schedule Drilling. <br /> Week of July 2,2001 Complete Drilling-Geo-Probe Soil Borings. <br /> Week of July 9,2001 Obtain Soil and Groundwater Data <br /> Week of July 9,2001 Complete soil boring installation report. Evaluate work completed to date to <br /> determine appropriate future course of action. <br /> 2937 Veneman Avenue, Suite B240 Geo-Phase Environmental Inc. Phone: (209) 569-0293 <br /> Modesto, Ca 95356 Fax: (209) 569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.