Laserfiche WebLink
Michael Kith [EH] <br /> From: Casandra Woodward <CWoodward@rubikenv.com> <br /> Sent: Wednesday, May 10, 2017 11:47 AM <br /> To: Michael Kith [EH] <br /> Cc: Steve Meninger <br /> Subject: modification to permit for APN 143-140-26 <br /> Michael, <br /> Per our conversation this morning we will over-bore the proposed wells to be destroyed. <br /> The amendment to the work plan is as follows: <br /> Wells E-1, PM-1, and PM-2 will no longer be pressure grouted and will now be over-bored to two feet passed the total <br /> depth of each well. After over-boing the well locations will be tremie grouted with neat cement through the drilling rods <br /> to ground surface in accordance with San Joaquin County Standards. <br /> E-1 will be over-bored to 77 feet below ground surface. <br /> PM-1 will be over-bored to 81 feet below ground surface. <br /> PM-2 will be over-bored to 82 feet below ground surface. <br /> Please let me know if you have any further questions. <br /> Thank you, <br /> Casandra Woodward, HT I I Hydrologist <br /> Rubik I Environmental Consulting <br /> 775.800.6850(d) 1775.530.6298 (c) 1775.622.0857 (o) <br /> 320 Flint Street I Reno, Nevada 895011 more I vCard <br /> AIH#09-HT-1061 <br /> rubikenv.com <br /> 1 <br />