Laserfiche WebLink
COMPASS LAND <br />G R O U P <br />3. §9-605.6(m)(1)(C): The continuation of the accessory use does not preclude replacement <br />and modification from time to time of obsolete, inefficient, and/or nonfunctional <br />equipment and modernization, including, but not limited to, an increase in hourly <br />production, provided the annual production is not increased. <br />Consistency Determination: Consistent. GRI maintains the plant equipment, as needed, <br />to ensure safe and efficient operation and maintain compliance with applicable <br />regulatory requirements (e.g., San Joaquin Valley Air Pollution Control District, Central <br />Valley Regional Water Quality Control Board). No changes to approved production levels <br />are requested. <br />4. §9-605.6(m)(1)(D): Reclamation of the excavation site subject to the Quarry Excavation <br />Permit, less the area occupied by the accessory use, shall be completed or shall be initiated <br />prior to or simultaneously with the approval of the application for Revision of Approved <br />Actions and shall be completed within two (2) years of the commencement of the <br />reclamation process. <br />Consistency Determination: Consistent. The former excavation area located outside of <br />the accessory use area has been reclaimed consistent with the approved Reclamation <br />Plan. As described in the response to §9-605.6(m)(1)(E), below, the area occupied by the <br />accessory use will be reclaimed within the term specified by the permit, unless otherwise <br />extended. <br />5. §9-605.6(m)(1)(E): The area occupied by the accessory use shall be reclaimed within the <br />time permit required by the Revision of Approved Actions, and if there is no such time <br />period requirement in the Revision of Approved Actions, the reclamation process shall be <br />completed within two (2) years of the expiration of the Revision of Approved Actions or <br />within two (2) years of the time that the accessory use ceases to be operated or utilized, <br />whichever comes first. <br />Consistency Determination: Consistent. Requirement acknowledged. The area occupied <br />by the accessory use will be reclaimed within the term specified by the permit, unless <br />otherwise extended. <br />6. §9-605.6(m)(1)(F): The term of the Revision of Approved Actions allowing continuation of <br />the accessory use shall be determined by an amortization schedule based upon the <br />projected useful life of the accessory use. The term of the Revision of Approved Actions <br />shall not exceed thirty (30) years from the date the Revision of Approved Actions is <br />approved. <br />Page 5 <br />