My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014091
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HENRY
>
22469
>
2600 - Land Use Program
>
PA-0400250
>
SU0014091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2024 11:50:59 AM
Creation date
5/12/2021 2:18:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014091
PE
2656
FACILITY_NAME
PA-0400250
STREET_NUMBER
22469
Direction
S
STREET_NAME
HENRY
STREET_TYPE
RD
City
ESCALON
Zip
95320-
APN
24905017
ENTERED_DATE
4/22/2021 12:00:00 AM
SITE_LOCATION
22469 S HENRY RD
RECEIVED_DATE
10/27/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPASS LAND <br /> GROUP <br /> March 4, 2029 (Condition of Approval No. 14 [Duration of Approval]); however, GRI is not <br /> anticipated to exhaust mineral reserves at the Bellino Quarry and Hendrick Quarry (which supply <br /> the M&P Facility) until 2054. <br /> The M&P Facility, Bellino Quarry,and Hendrick Quarryoperate under separate Quarry Excavation <br /> Permits ("Permit" or "Permits") issued by the County. GRI is seeking a time extension to each <br /> Permit (and associated text update to the phasing schedule of the reclamation plans)to align the <br /> term of all three entitlements with the life of remaining permitted aggregate reserves ("Project"). <br /> Specifically, GRI seeks the following changes to the existing entitlements: <br /> 1. Bellino Quarry: Amendment to Revisions of Approved Actions for Quarry Excavation <br /> Application No. PA-0200370 to extend the permit term by 15 years (to December 2044). <br /> Associated text change to the Bellino Quarry Reclamation Plan to update the estimated <br /> reclamation phasing schedule to comport with the requested permit term. <br /> 2. Hendrick Quarry: Amendment to Revisions of Approved Actions for Quarry Excavation <br /> Application No. PA-0400250 to extend the permit term by 25 years (to December 2054). <br /> Associated text change to the Hendrick Quarry Reclamation Plan to update the estimated <br /> reclamation phasing schedule to comport with the requested permit term. <br /> 3. M&P Facility: Amendment to Revisions of Approved Actions for Quarry Excavation <br /> Application No. QX-89-2 to allow for a continuation of an accessory use for 25 years (to <br /> December 2054). <br /> See Attachment A, Proposed Changes to Existing Entitlements for redlined changes to the <br /> existing entitlements to account for the proposed extension of time. <br /> Other than the extension of time,GRI seeks no change to any element of the approved operations <br /> or Permits. The Project would not modify the current productions levels, area of mining, <br /> materials to be mined, or mining methods, and the overall production and processing activities <br /> would be consistent with existing conditions. <br /> PROJECT <br /> Aggregate mining and processing sites in California are notoriously difficult to permit and require <br /> significant capital investment to develop. Once a mine site is operational, it is preferential from <br /> an environmental and operational standpoint that the permitted reserves be fully mined to avoid <br /> the cost and environmental impact of developing alternative sources of aggregate to serve a local <br /> market. As such, it is important for Company and community long-range planning that the term <br /> of the mining and processing permits align with the anticipated life of the aggregate reserve. <br /> -- - - - - Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.